Back to kitchen remodel contractors
Kendu Construction
- Based in
- Oakland
- On San Francisco permits
- Nov 2005 to Jan 2015
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2008 | Completed final sign-off Feb 2009 | 1466 23rd Av | interior remodel kitchen. replace sink, disposal, ref. dishwasher / hood. remodel bathroom. shower, toilet, vanity, reroof, upgrade electrical panel, replace furnace, no structural work.Details
interior remodel kitchen. replace sink, disposal, ref. dishwasher / hood. remodel bathroom. shower, toilet, vanity, reroof, upgrade electrical panel, replace furnace, no structural work. | $35,000 |
| Sep 4, 2007 | Completed final sign-off Nov 2007 | 19 Burlwood Dr | kitchen remodeling, replace kitchen cabinet, new flooring, kitchen sink & stoven no structural work. (e) lighting to remain.Details
kitchen remodeling, replace kitchen cabinet, new flooring, kitchen sink & stoven no structural work. (e) lighting to remain. | $9,600 |