Back to bathroom remodel contractors
Kendu Construction
- Based in
- Oakland
- On San Francisco permits
- Nov 2005 to Jan 2015
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2015 | Expired or cancelled expired Jun 2017 | 33 Atalaya Tr | revision to app#201411131417. modify walls. provide new bath room on 2nd floor. relocate stair. add skylight and modify windows. add deck at north side.Details
revision to app#201411131417. modify walls. provide new bath room on 2nd floor. relocate stair. add skylight and modify windows. add deck at north side. | $20,000 |
| Sep 10, 2014 | Never finaled issued Sep 2014, no final | 1088 Rhode Island St | revision to 201406249392. new conditioned bedroom at front lower level. lowered floor line. also with added full bathDetails
revision to 201406249392. new conditioned bedroom at front lower level. lowered floor line. also with added full bath | $40,000 |
| Jul 3, 2014 | Completed final sign-off May 2015 | 527 Oak Park Dr | convert 144 sf @ garage to living area, add 177 sf of living area 1st flr rear, remodel interior stair, remodel 1st and 2nd floor 1800 sf, 2 bath & kit remodel, add 1 bathrm in 1st flr, add 6 ea sky light, & reroof,living dining & kit areaDetails
convert 144 sf @ garage to living area, add 177 sf of living area 1st flr rear, remodel interior stair, remodel 1st and 2nd floor 1800 sf, 2 bath & kit remodel, add 1 bathrm in 1st flr, add 6 ea sky light, & reroof,living dining & kit area | $120,000 |
| Jun 4, 2014 | Completed final sign-off Nov 2014 | 414 Moraga St | add 1 bedroom, 1 family room, 1 luandry, 2 baths on 1st floor per planDetails
add 1 bedroom, 1 family room, 1 luandry, 2 baths on 1st floor per plan | $35,000 |
| Mar 21, 2011 | Completed final sign-off Dec 2011 | 762 27th Av | ground floor renovation to add a full bathroom, laundry area and enlarge (e) window, pa# 2006.05.22.2180 issued but not completed construction yet to add a story and 2nd dwelling unit.Details
ground floor renovation to add a full bathroom, laundry area and enlarge (e) window, pa# 2006.05.22.2180 issued but not completed construction yet to add a story and 2nd dwelling unit. | $7,500 |
| Sep 24, 2010 | Completed final sign-off Nov 2010 | 194 Chilton Av | basement remodel. remodel (e)bedroom. enlarge partitionwall. enclose uitlity rm, floor drain in utility rm. remodel bath. enlarge shower pan. replace vanity, toilet shower. relocate laundry rm to grg, relocate water heaterDetails
basement remodel. remodel (e)bedroom. enlarge partitionwall. enclose uitlity rm, floor drain in utility rm. remodel bath. enlarge shower pan. replace vanity, toilet shower. relocate laundry rm to grg, relocate water heater | $20,000 |
| Sep 9, 2008 | Completed final sign-off Feb 2009 | 1466 23rd Av | replace 11 windows,convert laundry rm into 2nd bathrm, relocate laundry rm to bsmt, finish bsmt w/drywall. 2/fl-remove plaster& replace 5/8 dry wall (75%)dryrot repair at frt under window sill. add 1/2 bath in bsmt, 5/8 cdx sheathing flat roof.gas fireplace in living rm.add&remove 5 @ partition wallDetails
replace 11 windows,convert laundry rm into 2nd bathrm, relocate laundry rm to bsmt, finish bsmt w/drywall. 2/fl-remove plaster& replace 5/8 dry wall (75%)dryrot repair at frt under window sill. add 1/2 bath in bsmt, 5/8 cdx sheathing flat roof.gas fireplace in living rm.add&remove 5 @ partition wall | $98,000 |
| Aug 29, 2008 | Completed final sign-off Feb 2009 | 1466 23rd Av | interior remodel kitchen. replace sink, disposal, ref. dishwasher / hood. remodel bathroom. shower, toilet, vanity, reroof, upgrade electrical panel, replace furnace, no structural work.Details
interior remodel kitchen. replace sink, disposal, ref. dishwasher / hood. remodel bathroom. shower, toilet, vanity, reroof, upgrade electrical panel, replace furnace, no structural work. | $35,000 |
| Jan 3, 2008 | Completed final sign-off May 2008 | 4015 24th St | remove sheetrock, install insulation, remodel upper bathroom (bathtub to shower). relocate one wall, install new receptacles. no structural work.Details
remove sheetrock, install insulation, remodel upper bathroom (bathtub to shower). relocate one wall, install new receptacles. no structural work. | $12,000 |
| Dec 31, 2007 | Completed final sign-off Jun 2008 | 347 Seneca Av | new guest room,bedroom, bathroom and laundry room at garage level.infill under overhang at garage levelDetails
new guest room,bedroom, bathroom and laundry room at garage level.infill under overhang at garage level | $50,000 |
| Nov 27, 2007 | Completed final sign-off Mar 2008 | 76 Dartmouth St | add bathroom and play room in garage area.Details
add bathroom and play room in garage area. | $12,000 |
| Aug 22, 2007 | Completed final sign-off Nov 2007 | 19 Burlwood Dr | master bathroom remodel. remove & replace tub. shower, toilet. sink. medicine cabinet. replace 4" rec light. exhause fan. redo tile wall & floor. renovation to comply with title 24 energy code.Details
master bathroom remodel. remove & replace tub. shower, toilet. sink. medicine cabinet. replace 4" rec light. exhause fan. redo tile wall & floor. renovation to comply with title 24 energy code. | $8,500 |