Kelly Brother's Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Feb 2017
- Last 24 months
- 0 permits filed
65 permits since 2000: 58 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 13 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 42 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2017 | Completed final sign-off Apr 2017 | 705 Victoria St | repair front stair due to termite and water damage. retain terrazzo steps and reinstall. repair stucco side walls to match existing. retain and reinstall metal railings. add new railing. repair concrete landings to match existing scoring pattern. front stair repair in-kind;Details
repair front stair due to termite and water damage. retain terrazzo steps and reinstall. repair stucco side walls to match existing. retain and reinstall metal railings. add new railing. repair concrete landings to match existing scoring pattern. front stair repair in-kind; | $24,000 |
| Sep 2, 2016 | Completed final sign-off Dec 2016 | 2488 45th Av | repair dry rot at front stairs and landing. less than 50%.Details
repair dry rot at front stairs and landing. less than 50%. | $6,000 |
| Jun 3, 2016 | Completed final sign-off Jul 2016 | 444 Dewey Bl | repair dry rot at front stairs upper landing only, less than 50%Details
repair dry rot at front stairs upper landing only, less than 50% | $6,000 |
| Apr 14, 2016 | Completed final sign-off Dec 2016 | 1926 16th Av | item 3a lingruen associates report #68940 dated 4/7/2016; dry rot repair, replace in-kind, front stairs.Details
item 3a lingruen associates report #68940 dated 4/7/2016; dry rot repair, replace in-kind, front stairs. | $14,000 |
| May 12, 2015 | Completed final sign-off Jun 2016 | 1038 Balboa St | ground floor remodel to create new living space & rear horizontal addition. reconfigure deck stairs. all structural work has been approved under 2015-04-01-2523.Details
ground floor remodel to create new living space & rear horizontal addition. reconfigure deck stairs. all structural work has been approved under 2015-04-01-2523. | $20,000 |
| May 7, 2013 | Completed final sign-off Jun 2013 | 1950 Sacramento St | rear stairs repair remove dry rot posts less than 50%. framing, landing, railing and threads. replace with pressure-treated posts and framing. tongue and groove landing and railing. replace damaged siding visible from ground at 2 lightwells.Details
rear stairs repair remove dry rot posts less than 50%. framing, landing, railing and threads. replace with pressure-treated posts and framing. tongue and groove landing and railing. replace damaged siding visible from ground at 2 lightwells. | $6,500 |
| Nov 21, 2011 | Completed final sign-off Dec 2012 | 1019 Church St | remodel bathroom, add bay windows to rear, structural work in garage, new interior stairs, relocate water heater & furnaceDetails
remodel bathroom, add bay windows to rear, structural work in garage, new interior stairs, relocate water heater & furnace | $119,000 |
| Jun 29, 2010 | Completed final sign-off Jun 2011 | 130 18th Av | renovate exist garage level family room & infill family rm addition under main level living space & deck. add bath at garage level, new stair connection to main level. relocate bath at main level & renovate bath at upper level. new lightwell infill at main & upper level.Details
renovate exist garage level family room & infill family rm addition under main level living space & deck. add bath at garage level, new stair connection to main level. relocate bath at main level & renovate bath at upper level. new lightwell infill at main & upper level. | $200,000 |
| Apr 14, 2009 | Completed final sign-off Apr 2009 | 165 Pfeiffer St | repair siding at stair connection & damage stair framing & any un-seen water damage inside wall, if found at (e) rear fire stair. all work to be in-kind replacement not to exceed 50% of stair exist structure. waterproof as req linear footage of new siding-approx 25'.Details
repair siding at stair connection & damage stair framing & any un-seen water damage inside wall, if found at (e) rear fire stair. all work to be in-kind replacement not to exceed 50% of stair exist structure. waterproof as req linear footage of new siding-approx 25'. | $5,000 |
| Mar 30, 2007 | Expired or cancelled expired Sep 2008 | 251 Munich St | to correct violation#200452523 his nov. includ repairs to (e) stairs, effecting less than 50%Details
to correct violation#200452523 his nov. includ repairs to (e) stairs, effecting less than 50% | $25,000 |
| Jul 26, 2005 | Never finaled issued Nov 2005, no final | 1345 12th Av | no penalties- nov 200559836. remove/rebuilt (e)footing (front main bldg.)add 2 car garage @g/f & remodel apt.#3 @g/f.rebuilt front stairDetails
no penalties- nov 200559836. remove/rebuilt (e)footing (front main bldg.)add 2 car garage @g/f & remodel apt.#3 @g/f.rebuilt front stair | $50,000 |
| Apr 29, 2005 | Never finaled issued Apr 2005, no final | 1345 12th Av | n.o.v3200559836-front stair repair/back stair epair, remodel kitchens & bathrooms, new plubing , newDetails
n.o.v3200559836-front stair repair/back stair epair, remodel kitchens & bathrooms, new plubing , new | $90,000 |
| Jan 31, 2005 | Completed final sign-off Feb 2005 | 1847 Clay St | repair dry rot damage at back stairs per markoff structural pest report #041419 dated 11/17/04 sameDetails
repair dry rot damage at back stairs per markoff structural pest report #041419 dated 11/17/04 same | $7,000 |
| May 5, 2004 | Completed final sign-off May 2004 | 2414 Pine St | repair dryrot @rear stairs to garage.provide handrails @stairs.repair sheetrock in garage/lobbyDetails
repair dryrot @rear stairs to garage.provide handrails @stairs.repair sheetrock in garage/lobby | $4,500 |
| Feb 10, 2004 | Completed final sign-off Apr 2004 | 833 Shrader St | repair dry rot on stair & sill in garage beetle damage per report #863155 item 1e,3a,4a,11bDetails
repair dry rot on stair & sill in garage beetle damage per report #863155 item 1e,3a,4a,11b | $6,000 |
| Jan 9, 2002 | Completed final sign-off Jan 2002 | 1375 27th Av | repair dry rot at back stairs comply with n.o.v. 2001/23/144.Details
repair dry rot at back stairs comply with n.o.v. 2001/23/144. | $1,500 |