Back to bathroom remodel contractors
Kelly Brother's Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Feb 2017
- Last 24 months
- 0 permits filed
65 permits since 2000: 58 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Feb 2017 | 375 04th Av | remove unpermitted bathroom at ground fl rear. convert area back to storage to address comply with physical inspection report #8071.Details
remove unpermitted bathroom at ground fl rear. convert area back to storage to address comply with physical inspection report #8071. | $1,000 |
| Dec 13, 2016 | Completed final sign-off May 2017 | 2792 California St | kitchen and dining room remodel. removal of wall between kitchen and dining room new bedroom and new bathroom.Details
kitchen and dining room remodel. removal of wall between kitchen and dining room new bedroom and new bathroom. | $45,000 |
| Aug 9, 2016 | Completed final sign-off Jan 2017 | 1926 16th Av | remodel to bath on 1st. new radiant heat. new bedroom & storage space.Details
remodel to bath on 1st. new radiant heat. new bedroom & storage space. | $20,000 |
| Jan 22, 2014 | Completed final sign-off Feb 2017 | 2177 09th Av | remodel of kitchen on main level, addition of 2 bathroom & 2 bedrooms on lower level.Details
remodel of kitchen on main level, addition of 2 bathroom & 2 bedrooms on lower level. | $120,000 |
| Dec 27, 2013 | Expired or cancelled cancelled Nov 2016 | 2177 09th Av | remodel bathroom at top level; to comply with cec150(k) 10Details
remodel bathroom at top level; to comply with cec150(k) 10 | $11,000 |
| Nov 21, 2011 | Completed final sign-off Dec 2012 | 1019 Church St | remodel bathroom, add bay windows to rear, structural work in garage, new interior stairs, relocate water heater & furnaceDetails
remodel bathroom, add bay windows to rear, structural work in garage, new interior stairs, relocate water heater & furnace | $119,000 |
| Jun 29, 2010 | Completed final sign-off Jun 2011 | 130 18th Av | renovate exist garage level family room & infill family rm addition under main level living space & deck. add bath at garage level, new stair connection to main level. relocate bath at main level & renovate bath at upper level. new lightwell infill at main & upper level.Details
renovate exist garage level family room & infill family rm addition under main level living space & deck. add bath at garage level, new stair connection to main level. relocate bath at main level & renovate bath at upper level. new lightwell infill at main & upper level. | $200,000 |
| Mar 16, 2010 | Completed final sign-off Jul 2010 | 2674 16th Av | items 1a, 1b, 1c, 1d, 1e, 3a, 3b, 4a, 5a & 5b per lingruen associates report # 54659 dated 12/14/09. remodel kitchen and bathroom and add powder room at main level. no moving of walls.Details
items 1a, 1b, 1c, 1d, 1e, 3a, 3b, 4a, 5a & 5b per lingruen associates report # 54659 dated 12/14/09. remodel kitchen and bathroom and add powder room at main level. no moving of walls. | $20,000 |
| Jul 22, 2009 | Completed final sign-off Jan 2010 | 580 03rd Av | fire damage repair in unit 580-a. no structural work. replace sheetrock in bedroom, hardwood floor in bedroom & living room, replace electrical @ entire unit. renovate bathroom.Details
fire damage repair in unit 580-a. no structural work. replace sheetrock in bedroom, hardwood floor in bedroom & living room, replace electrical @ entire unit. renovate bathroom. | $84,000 |
| Feb 9, 2006 | Completed final sign-off Dec 2006 | 190 Hermann St | remodel kitchen & bath.remodel at 190 herman flourescent lighting.Details
remodel kitchen & bath.remodel at 190 herman flourescent lighting. | $15,000 |
| Apr 29, 2005 | Never finaled issued Apr 2005, no final | 1345 12th Av | n.o.v3200559836-front stair repair/back stair epair, remodel kitchens & bathrooms, new plubing , newDetails
n.o.v3200559836-front stair repair/back stair epair, remodel kitchens & bathrooms, new plubing , new | $90,000 |