Block 1436, lot 014
377 04th Ave
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 19, 2019 | Completed final sign-off Jun 2021 | 375 04th Av | 300 sq ft addition to (e) deck on 2nd flr. located within buildable area of site and on (e) concrete deck. finish surface is less than 10'-0" above grade. 9n) footings, guardrails, framing and deckingDetails
300 sq ft addition to (e) deck on 2nd flr. located within buildable area of site and on (e) concrete deck. finish surface is less than 10'-0" above grade. 9n) footings, guardrails, framing and decking | $12,000 | |
| Jul 13, 2018 | Expired or cancelled cancelled Jan 2026 | 375 04th Av | remove load bearing wall between kitchen and diningDetails
remove load bearing wall between kitchen and dining | $10,000 | |
| Sep 6, 2017 | Never finaled issued Sep 2017, no final | 375 04th Av | street spaceDetails
street space | ||
| Dec 22, 2016 | Completed final sign-off Feb 2017 | 375 04th Av | Kelly Brother's Construction | remove unpermitted bathroom at ground fl rear. convert area back to storage to address comply with physical inspection report #8071.Details
remove unpermitted bathroom at ground fl rear. convert area back to storage to address comply with physical inspection report #8071. | $1,000 |
| Sep 20, 2016 | Expired or cancelled withdrawn Dec 2016 | 375 04th Av | garage level- bring bathroom up to code in storage area.Details
garage level- bring bathroom up to code in storage area. | $5,000 | |
| Aug 16, 2016 | Completed final sign-off Mar 2017 | 375 04th Av | to comply with physical inspection report #8071Details
to comply with physical inspection report #8071 | ||
| Apr 15, 2016 | Completed final sign-off Aug 2016 | 377 04th Av | Sunset Glass Inc | replace 7 front vinyl windows with wood-clad fiberglass windowsDetails
replace 7 front vinyl windows with wood-clad fiberglass windows | $12,000 |
| Feb 29, 2016 | Completed final sign-off Sep 2016 | 377 04th Av | replace rotten wood on rear stair- add handrails & risers; , banister. less than 50%Details
replace rotten wood on rear stair- add handrails & risers; , banister. less than 50% | $500 | |
| Nov 5, 2015 | Completed final sign-off Feb 2016 | 375 04th Av | Nicholas Spencer Firth Gen Contr | foundation to be repaired by demolishing extg crack and installing new foundation. repair attached walls and floors as needed.Details
foundation to be repaired by demolishing extg crack and installing new foundation. repair attached walls and floors as needed. | $30,000 |
| Apr 11, 2008 | Completed final sign-off Jul 2008 | 375 04th Av | add a toilet in ex. closet o n 2nd floor. convert ex. bedroom to bath on third floor.Details
add a toilet in ex. closet o n 2nd floor. convert ex. bedroom to bath on third floor. | $8,000 | |
| Mar 14, 2008 | Completed final sign-off Apr 2008 | 375 04th Av | window trim replacement - stucco moulding, restucco around the stucco mouldingDetails
window trim replacement - stucco moulding, restucco around the stucco moulding | $500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kelly Brother's Construction, Nicholas Spencer Firth Gen Contr, Sunset Glass Inc
- Architects
- Dennis King O'kelly
- Engineers
- Thomas Podesta