Back to kitchen remodel contractors
Keightley Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to May 2026
- Last 24 months
- 23 permits filed
98 permits since 2000: 73 completed, 16 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
28 kitchen remodel permits: 21 completed, 6 in progress, 1 expired or cancelled. Typically 6 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued Jun 2026 | 3121 Balboa St | revise pa 202602175996 to expand scope of fire damage repair to include full renovation of (2) kitchens & 2 bathrooms. reflect extent of cost for demolition/replacement of smoke & fire damaged materials. plywood shearwalls in transverse/longitudinal due to substantial 67% alteration.Details
revise pa 202602175996 to expand scope of fire damage repair to include full renovation of (2) kitchens & 2 bathrooms. reflect extent of cost for demolition/replacement of smoke & fire damaged materials. plywood shearwalls in transverse/longitudinal due to substantial 67% alteration. | $536,840 |
| Feb 20, 2026 | In progress filed Feb 2026, not yet issued | 2920 Jackson St | ref pa 202507251625 add 500 sf conditioned space; relocate 2nd fl kitchen to 1st fl; add bathroomDetails
ref pa 202507251625 add 500 sf conditioned space; relocate 2nd fl kitchen to 1st fl; add bathroom | $70,000 |
| Apr 22, 2025 | In progress issued Sep 2025 | 449 11th Av | 1/f: excavate 1ft & relocate unit 451 to lower level. 20x14ft rear horiz addition. add 1200sf with 2bed & 2bath.2/f unit 449 to 2 levels. kitchen & bath remodel. new roof deck over rear add. infill nrth lightwell. 3/f: bath remodel. new laundry & bath.Details
1/f: excavate 1ft & relocate unit 451 to lower level. 20x14ft rear horiz addition. add 1200sf with 2bed & 2bath.2/f unit 449 to 2 levels. kitchen & bath remodel. new roof deck over rear add. infill nrth lightwell. 3/f: bath remodel. new laundry & bath. | $465,000 |
| Mar 24, 2025 | In progress issued May 2025 | 440 Waller St | renovation of 2 story single family residence. basement: infill west exterior stair cavity; add bath; 1st fl - kitchen remodel, reconfigure & reduce rear 1 story structure. 5 ft side addition; 2nd fl - add bath: remodel bathDetails
renovation of 2 story single family residence. basement: infill west exterior stair cavity; add bath; 1st fl - kitchen remodel, reconfigure & reduce rear 1 story structure. 5 ft side addition; 2nd fl - add bath: remodel bath | $186,000 |
| Nov 25, 2024 | In progress issued Nov 2024 | 446 Waller St | remodel one bath and one kitchen in kind in each unit (total of 2 baths, 2 kitchens).Details
remodel one bath and one kitchen in kind in each unit (total of 2 baths, 2 kitchens). | $90,000 |
| Nov 25, 2024 | In progress issued Nov 2024 | 440 Waller St | remodel one bath and kitchen in kind.Details
remodel one bath and kitchen in kind. | $60,000 |
| Oct 7, 2024 | Completed final sign-off Mar 2025 | 2901 Lake St | rev 202408067993- (n) corridor structure connecting garage to kitchen /living room. corridor is an infill undereath (e) roof overhang. convert 2nd floor storage to conditioned flex room. kitchen remodel update primary bath remodel. add (2) skylights located above primary bathroom and master closet.Details
rev 202408067993- (n) corridor structure connecting garage to kitchen /living room. corridor is an infill undereath (e) roof overhang. convert 2nd floor storage to conditioned flex room. kitchen remodel update primary bath remodel. add (2) skylights located above primary bathroom and master closet. | $93,000 |
| Feb 13, 2024 | Completed final sign-off Nov 2024 | 3527 Webster St | new roof deck and skyligiht access hatch. for exclusive use on top unit. 3527 webster. partial removal of kitchen dining rm wall and removal of door.Details
new roof deck and skyligiht access hatch. for exclusive use on top unit. 3527 webster. partial removal of kitchen dining rm wall and removal of door. | $106,000 |
| Jun 5, 2023 | Completed final sign-off Nov 2023 | 586 Clipper St | revision to bpa#202209162591, remove interior shear wall btwn bedroom/kitchen, install slider @ 2/f, add strong walls, upgrade substandard garage framing, update mf bracing, minor update to basement foundation grade beam @ gl 4, remove internal basement wallDetails
revision to bpa#202209162591, remove interior shear wall btwn bedroom/kitchen, install slider @ 2/f, add strong walls, upgrade substandard garage framing, update mf bracing, minor update to basement foundation grade beam @ gl 4, remove internal basement wall | $19,000 |
| Jun 1, 2023 | Completed final sign-off Sep 2023 | 2918 Jackson St | remove structural wall btwn hallway/kitchen, non structural wall btwn dining/kitchen @ 3rd fl; (n) skylight over kitchen; (2) structural beams & (3) posts w/(n) spread foundations cap (e) brick foundation wall adjacent to crawl space. ref pa 2023-0308-3279; 3rd fl kitchen/bathroom remodelDetails
remove structural wall btwn hallway/kitchen, non structural wall btwn dining/kitchen @ 3rd fl; (n) skylight over kitchen; (2) structural beams & (3) posts w/(n) spread foundations cap (e) brick foundation wall adjacent to crawl space. ref pa 2023-0308-3279; 3rd fl kitchen/bathroom remodel | $58,000 |
| Apr 18, 2023 | Completed final sign-off Nov 2024 | 806 Holloway Av | remodel kitchen at 2nd fl, new electrical, sheetrock, voluntary structural strengthening at grade level, relocate water heater.Details
remodel kitchen at 2nd fl, new electrical, sheetrock, voluntary structural strengthening at grade level, relocate water heater. | $89,000 |
| Mar 27, 2023 | Completed final sign-off Mar 2023 | 1927 Washington St | revision to 202109239002. document as-built kitchens all 3 units for final inspection. (kitchen island revised); 4th floor unit: alter bath & kitchen layoutDetails
revision to 202109239002. document as-built kitchens all 3 units for final inspection. (kitchen island revised); 4th floor unit: alter bath & kitchen layout | |
| Mar 23, 2023 | Completed final sign-off Aug 2023 | 75 Folsom St | unit 1800: replace kitchen in-kind, cabinets/countertops/electrical, replace (2) bathrooms in-kind, tile/vanity/plumbing fixtures/glassDetails
unit 1800: replace kitchen in-kind, cabinets/countertops/electrical, replace (2) bathrooms in-kind, tile/vanity/plumbing fixtures/glass | $75,000 |
| Mar 8, 2023 | Completed final sign-off Sep 2023 | 2918 Jackson St | replace kitchen in-kind counter tops, cabinets, appliance. replace in-kind master bathroom shower, sink, vanity, new electrical. work on 3rd floor. kitchen roughly 175 sf, bath roughly 95 sf.Details
replace kitchen in-kind counter tops, cabinets, appliance. replace in-kind master bathroom shower, sink, vanity, new electrical. work on 3rd floor. kitchen roughly 175 sf, bath roughly 95 sf. | $100,000 |
| Nov 1, 2022 | Completed final sign-off May 2023 | 761 San Bruno Av | 2/f: renovation of lower unit (761 san bruno). kitchen and bathroom remodel. removal of load-bearing wall between kitchen and living room. partial seismic upgrade with plywood shearwalls. partial foundation upgrade at rear. add sliding door at rear and add powder room.Details
2/f: renovation of lower unit (761 san bruno). kitchen and bathroom remodel. removal of load-bearing wall between kitchen and living room. partial seismic upgrade with plywood shearwalls. partial foundation upgrade at rear. add sliding door at rear and add powder room. | $88,000 |
| Jul 21, 2022 | Completed final sign-off Dec 2022 | 230 Texas St | replace 2 sky lights & 7 rear windows in-kind. replce kitchen in-0kind. replace 2 bathrooms in-kind. all work to comply with 202185218.Details
replace 2 sky lights & 7 rear windows in-kind. replce kitchen in-0kind. replace 2 bathrooms in-kind. all work to comply with 202185218. | $90,000 |
| Dec 17, 2021 | Completed final sign-off Aug 2022 | 398 Castenada Av | (n) windows along east & west walls (3'-0" p.l setback min). 2nd fl: (n) entry door. (n) powder. (n) sliding door at living to courtyard. remove wall between kitchen/living. 3rd fl: repair (e) deck less than 50%Details
(n) windows along east & west walls (3'-0" p.l setback min). 2nd fl: (n) entry door. (n) powder. (n) sliding door at living to courtyard. remove wall between kitchen/living. 3rd fl: repair (e) deck less than 50% | $140,000 |
| Oct 4, 2021 | Completed final sign-off Aug 2022 | 398 Castenada Av | replace in kind one kitchen, three bathrooms, and one powder room. replace in kind two windows and one sliding door unit at back of building.Details
replace in kind one kitchen, three bathrooms, and one powder room. replace in kind two windows and one sliding door unit at back of building. | $100,000 |
| Jul 22, 2021 | Completed final sign-off Jul 2024 | 447 08th Av | remodel 2 units, remove structural hall between dining room and kitchen, kitchen remodel, bath remodel, add new bath, infill internal exterior stair at south of propertyDetails
remodel 2 units, remove structural hall between dining room and kitchen, kitchen remodel, bath remodel, add new bath, infill internal exterior stair at south of property | $105,000 |
| Mar 9, 2021 | Completed final sign-off Nov 2021 | 2160 Pacific Av | #4 -interior remodel of kitchen, dining room, and master bath. no change to exterior envelope.including removal of a portion of 2 walls, installtion of a header beam and sistering new joists to extg joists.Details
#4 -interior remodel of kitchen, dining room, and master bath. no change to exterior envelope.including removal of a portion of 2 walls, installtion of a header beam and sistering new joists to extg joists. | $40,000 |
| Feb 19, 2021 | Completed final sign-off Dec 2022 | 3722 20th St | ground floor: infill ground fl. underneath extg rear popout structure, add habitable space for lower unit (3722 20th st.) with interior stair conn.(1) new bath & kitchen. 2nd fl: remodel & add 2 bath & 1 bedroom. 3rd fl: remodel kitchen and (n) bath (3724 20th stDetails
ground floor: infill ground fl. underneath extg rear popout structure, add habitable space for lower unit (3722 20th st.) with interior stair conn.(1) new bath & kitchen. 2nd fl: remodel & add 2 bath & 1 bedroom. 3rd fl: remodel kitchen and (n) bath (3724 20th st | $210,000 |
| Dec 1, 2020 | Completed final sign-off Aug 2021 | 1921 Washington St | new skylights & windows at rear facade. reconstruct internal staircase. remodel kitchen and bathrooms. add (1) bath. entry door to be centered (setback behind gate).Details
new skylights & windows at rear facade. reconstruct internal staircase. remodel kitchen and bathrooms. add (1) bath. entry door to be centered (setback behind gate). | $400,000 |
| Aug 31, 2020 | Expired or cancelled withdrawn Aug 2022 | 4011 25th St | kitchen remodel new bath 2nd fl. remove rear windows in dining rm to be replaced with sliding doors. new opening btwn kitchen and dining. structural work required.Details
kitchen remodel new bath 2nd fl. remove rear windows in dining rm to be replaced with sliding doors. new opening btwn kitchen and dining. structural work required. | $46,000 |
| Aug 24, 2020 | Completed final sign-off Feb 2022 | 3665 19th St | rear cottage work only. 2 bedroom & 2 bath at g/f (18 cy excavation), 2/f: kitchen/bathroom remodel, lightwell infill. (n) stair to attic & to g/f. lateral upgrade per ab-094 standards. ref pa202101293647 for attic/dormer work.Details
rear cottage work only. 2 bedroom & 2 bath at g/f (18 cy excavation), 2/f: kitchen/bathroom remodel, lightwell infill. (n) stair to attic & to g/f. lateral upgrade per ab-094 standards. ref pa202101293647 for attic/dormer work. | $127,000 |
| Jul 29, 2019 | Completed final sign-off Nov 2019 | 34 Collins St | residential renovation at 34 collins (upper unit #201). kitchen cabinetry & appliances to be replaced & reconfigured. expand north facing side window to 108x45 vinyl window (fixed). non-structural partition wall separating kitchen & dining orom to be removed.Details
residential renovation at 34 collins (upper unit #201). kitchen cabinetry & appliances to be replaced & reconfigured. expand north facing side window to 108x45 vinyl window (fixed). non-structural partition wall separating kitchen & dining orom to be removed. | $10,000 |
| Jun 4, 2019 | Completed final sign-off Aug 2019 | 3415 Cesar Chavez St | unit c: replace in-kind kitchen cabinets & counter tops, tile, tubs & vanities in (2) bathrooms - 36 sq. ft. each, kitchen 30 sq. ft.Details
unit c: replace in-kind kitchen cabinets & counter tops, tile, tubs & vanities in (2) bathrooms - 36 sq. ft. each, kitchen 30 sq. ft. | $10,000 |
| Feb 20, 2018 | Completed final sign-off Aug 2018 | 669 Cayuga Av | interior remodel 2nd fl. remodel (e) kitchen and dining room, expand window at lightwell. roof 2 new skylightsDetails
interior remodel 2nd fl. remodel (e) kitchen and dining room, expand window at lightwell. roof 2 new skylights | $18,000 |
| May 9, 2017 | Completed final sign-off Mar 2018 | 2165 California St | 2nd fl: remodel kitchen, new powder rm, new sliding door assembly, new floor, ceiling finishes. 3rd fl new skylights, new sliding door assembly no work at gr fl, window replacements to match existing wood windowsDetails
2nd fl: remodel kitchen, new powder rm, new sliding door assembly, new floor, ceiling finishes. 3rd fl new skylights, new sliding door assembly no work at gr fl, window replacements to match existing wood windows | $60,000 |