Keightley Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to May 2026
- Last 24 months
- 23 permits filed
98 permits since 2000: 73 completed, 16 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 7 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2023 | Completed final sign-off Sep 2023 | 259 15th Av | infill underneath existing rear 3-story structure (90sqft), new rear yard deck & stair, convert 1st flr storage to office, bathroom & living space, new ground flr entry door adjacent to side of garage.Details
infill underneath existing rear 3-story structure (90sqft), new rear yard deck & stair, convert 1st flr storage to office, bathroom & living space, new ground flr entry door adjacent to side of garage. | $123,000 |
| Dec 17, 2021 | Completed final sign-off Aug 2022 | 398 Castenada Av | (n) windows along east & west walls (3'-0" p.l setback min). 2nd fl: (n) entry door. (n) powder. (n) sliding door at living to courtyard. remove wall between kitchen/living. 3rd fl: repair (e) deck less than 50%Details
(n) windows along east & west walls (3'-0" p.l setback min). 2nd fl: (n) entry door. (n) powder. (n) sliding door at living to courtyard. remove wall between kitchen/living. 3rd fl: repair (e) deck less than 50% | $140,000 |
| Jun 26, 2020 | Completed final sign-off Jun 2021 | 124 Haight St | revision to pa# 201605207974. basement: revert to (e) garage & stair to 1st level deck. reconfigure living room, bath, ktichen and laundry. 1st: revert to (e) stair from deck to 2nd level. reconfigure bedroom 3. (n) bath, closet in bedroom, 2 closet in bedroom, 2 laundry & storage. 2nd: (n) 2020Details
revision to pa# 201605207974. basement: revert to (e) garage & stair to 1st level deck. reconfigure living room, bath, ktichen and laundry. 1st: revert to (e) stair from deck to 2nd level. reconfigure bedroom 3. (n) bath, closet in bedroom, 2 closet in bedroom, 2 laundry & storage. 2nd: (n) 2020 | |
| Sep 4, 2018 | Completed final sign-off Mar 2019 | 116 10th Av | horizontal extension of rear yard deck(not to exceed (10'-0" in height) 4 roof dormers. add bedroom at ground at ground floor and minor interior alterations at 2nd, 3rd, 4th floors.Details
horizontal extension of rear yard deck(not to exceed (10'-0" in height) 4 roof dormers. add bedroom at ground at ground floor and minor interior alterations at 2nd, 3rd, 4th floors. | $100,000 |
| Jul 30, 2018 | Completed final sign-off Apr 2019 | 970 Guerrero St | rear deck stregtheningDetails
rear deck stregthening | $10,000 |