Back to kitchen remodel contractors
Kds Group Inc/Landmark Construction Com,
- Based in
- San Bruno
- On San Francisco permits
- Mar 2009 to Jul 2018
- Last 24 months
- 0 permits filed
41 permits since 2000: 40 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 25 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2015 | Completed final sign-off Feb 2017 | 1140 Bacon St | 2nd fl:infill litewell,create open flr plan for living rm,dinin rm &kitchen.add mstr bathrm,reloc(e)bathrm,demolish staircase to garage,& convert bedrm to laundry rm.grd flr:convert open air entry toliving space; add family rm,bedrm&full bathrm.perform voluntary seismic strenthing. upgradeelec panelDetails
2nd fl:infill litewell,create open flr plan for living rm,dinin rm &kitchen.add mstr bathrm,reloc(e)bathrm,demolish staircase to garage,& convert bedrm to laundry rm.grd flr:convert open air entry toliving space; add family rm,bedrm&full bathrm.perform voluntary seismic strenthing. upgradeelec panel | $150,000 |
| Mar 31, 2015 | Completed final sign-off Aug 2015 | 2849 Balboa St | 2nd flr: reconfiguration & kitchen remodel, add master bath & remodel bath #2. grnd flr: replace & relocate furnance & water heater. perform dry rot repair of approx 100 sq ft around bld exterior. install lights, switches & recptacles. upgrade ele panel to 150 ampDetails
2nd flr: reconfiguration & kitchen remodel, add master bath & remodel bath #2. grnd flr: replace & relocate furnance & water heater. perform dry rot repair of approx 100 sq ft around bld exterior. install lights, switches & recptacles. upgrade ele panel to 150 amp | $30,000 |
| Feb 10, 2014 | Completed final sign-off Aug 2014 | 301 Christopher Dr | 2nd fl: reconfigure & remodel kitchen. install steel beam & wooden posts. ground fl: install wooden post, steel column & concrete footings. relocate & replace furnace install lighting, switches & receptacles.Details
2nd fl: reconfigure & remodel kitchen. install steel beam & wooden posts. ground fl: install wooden post, steel column & concrete footings. relocate & replace furnace install lighting, switches & receptacles. | $28,000 |
| Jan 3, 2014 | Completed final sign-off Apr 2014 | 3520 Rivera St | replace 7 windows 2 at front aluminum clad wood at front only with vinyl at rear. replace furnace and install new ductwork. rplace service panel. replace receptkicales at living room kitchen bathroom.Details
replace 7 windows 2 at front aluminum clad wood at front only with vinyl at rear. replace furnace and install new ductwork. rplace service panel. replace receptkicales at living room kitchen bathroom. | $25,000 |
| Feb 28, 2012 | Completed final sign-off Jul 2012 | 520 Crestlake Dr | reconfigure and remodel kitchen, install lighting, switches, and receptacles in kitchen. open adjoining wall to (e) terrace, dining, kitchen and living room.Details
reconfigure and remodel kitchen, install lighting, switches, and receptacles in kitchen. open adjoining wall to (e) terrace, dining, kitchen and living room. | $18,000 |