Block 2674, lot 016
301 Christopher Dr
- City’s use
- Single Family Residential
- Built
- 1961
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,757 sq ft
- Lot
- 6,094 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2018 | Completed final sign-off Oct 2019 | 301 Christopher Dr | Stronghold Builders Inc | at laundry room at garage, add 2 partitions and add 20 minutes door and add sink and outlet.Details
at laundry room at garage, add 2 partitions and add 20 minutes door and add sink and outlet. | $5,000 |
| Sep 14, 2018 | Completed final sign-off Oct 2019 | 301 Christopher Dr | Stronghold Builders Inc | remodel one master bath on 1st fl. no change in wall, structure or fixture location. new shower pan replacement. 5x10, 50 sf.Details
remodel one master bath on 1st fl. no change in wall, structure or fixture location. new shower pan replacement. 5x10, 50 sf. | $7,500 |
| Aug 22, 2018 | Expired or cancelled cancelled Jan 2026 | 301 Christopher Dr | remodel (1) master bath on 1st fl - no change in walls, structure, or fixture location - new shower pan (replacement) 5w x 10l = 50sq ft.Details
remodel (1) master bath on 1st fl - no change in walls, structure, or fixture location - new shower pan (replacement) 5w x 10l = 50sq ft. | $5,000 | |
| Apr 2, 2014 | Completed final sign-off Aug 2014 | 301 Christopher Dr | Kds Group Inc/Landmark Construction Com, | renovate bathroom. replace tub, vanity sink, cabinet, counter top (e) exhaust. replace light fixt, outlet, lighting.Details
renovate bathroom. replace tub, vanity sink, cabinet, counter top (e) exhaust. replace light fixt, outlet, lighting. | $923,975 |
| Feb 10, 2014 | Completed final sign-off Aug 2014 | 301 Christopher Dr | Kds Group Inc/Landmark Construction Com, | 2nd fl: reconfigure & remodel kitchen. install steel beam & wooden posts. ground fl: install wooden post, steel column & concrete footings. relocate & replace furnace install lighting, switches & receptacles.Details
2nd fl: reconfigure & remodel kitchen. install steel beam & wooden posts. ground fl: install wooden post, steel column & concrete footings. relocate & replace furnace install lighting, switches & receptacles. | $28,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kds Group Inc/Landmark Construction Com, (2), Stronghold Builders Inc (2)
- Architects
- William Liang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.