Back to kitchen remodel contractors
Kaufman Construction
- Based in
- Berkeley
- On San Francisco permits
- Dec 2012 to Apr 2016
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 expired or cancelled. Typically 97 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 10, 2013 | Expired or cancelled cancelled Apr 2024 | 493 Broadway | interior tenant improvement to 9e) space, renovation includes new kitchen & bar at 1st floor & new cooking equipment at the basement (kitchen). m.e.p & life safety under seperate permitDetails
interior tenant improvement to 9e) space, renovation includes new kitchen & bar at 1st floor & new cooking equipment at the basement (kitchen). m.e.p & life safety under seperate permit | $280,000 |