Back to kitchen remodel contractors
Kashaneh Construction
- Based in
- Oakland
- On San Francisco permits
- Nov 2010 to Dec 2023
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 22 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2018 | Completed final sign-off May 2018 | 1603 Grove St | unit 1603 - close pantry in kitchen, open wall in bedroom to enlarge closet; install elec washer/dryer hookup (elec dryer & ventless). there is no fire alarm in bldgDetails
unit 1603 - close pantry in kitchen, open wall in bedroom to enlarge closet; install elec washer/dryer hookup (elec dryer & ventless). there is no fire alarm in bldg | $5,000 |
| Apr 3, 2018 | Completed final sign-off Jun 2019 | 1605 Grove St | unit 1605 & 1609: remodel kitchens, new cabinets; bath: replace tubs, add w/d hook ups, replace sinks, open bedroom closets, open windows to create doorwayDetails
unit 1605 & 1609: remodel kitchens, new cabinets; bath: replace tubs, add w/d hook ups, replace sinks, open bedroom closets, open windows to create doorway | $30,000 |
| Jun 26, 2017 | Completed final sign-off Jan 2018 | 2886 16th St | work at 2886-16th st. unit b only: : replace (e) kitchen cabinets, new app;liances, minor bathroom remodeling/replace toilet tub, sink and tileDetails
work at 2886-16th st. unit b only: : replace (e) kitchen cabinets, new app;liances, minor bathroom remodeling/replace toilet tub, sink and tile | $10,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2016 | 800 Lyon St | interior renovation of extg unit including expansion into extg storage space. work to include construction of new kitchen and 2.75 bathrooms. no exterior work and no increase to extg bldg sq footage.Details
interior renovation of extg unit including expansion into extg storage space. work to include construction of new kitchen and 2.75 bathrooms. no exterior work and no increase to extg bldg sq footage. | $80,000 |
| Apr 2, 2015 | Completed final sign-off Feb 2016 | 806 Lyon St | interior renovation of kitchen and 1/2 bath. relocating (e) full bathDetails
interior renovation of kitchen and 1/2 bath. relocating (e) full bath | $50,000 |
| Nov 10, 2010 | Completed final sign-off Dec 2010 | 53 Duncan St | install sink in kitchen and 2 sinks in bathroom and 2 toilet; repair damaged wood and fungus, repair foundation, replace deteriorated brick as needed, misc repairs as needed to doors and windows at rearDetails
install sink in kitchen and 2 sinks in bathroom and 2 toilet; repair damaged wood and fungus, repair foundation, replace deteriorated brick as needed, misc repairs as needed to doors and windows at rear | $4,000 |