Back to bathroom remodel contractors
Kashaneh Construction
- Based in
- Oakland
- On San Francisco permits
- Nov 2010 to Dec 2023
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 42 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2018 | Completed final sign-off Jun 2019 | 1605 Grove St | unit 1605 & 1609: remodel kitchens, new cabinets; bath: replace tubs, add w/d hook ups, replace sinks, open bedroom closets, open windows to create doorwayDetails
unit 1605 & 1609: remodel kitchens, new cabinets; bath: replace tubs, add w/d hook ups, replace sinks, open bedroom closets, open windows to create doorway | $30,000 |
| Mar 6, 2018 | Completed final sign-off May 2018 | 1607 Grove St | to comply with complaint 201842291, remodel bathroom, legalize lightwell(see planning's note) as part of bathroom, move hot water heater & vent properlyDetails
to comply with complaint 201842291, remodel bathroom, legalize lightwell(see planning's note) as part of bathroom, move hot water heater & vent properly | $4,000 |
| Jun 26, 2017 | Completed final sign-off Jan 2018 | 2886 16th St | work at 2886-16th st. unit b only: : replace (e) kitchen cabinets, new app;liances, minor bathroom remodeling/replace toilet tub, sink and tileDetails
work at 2886-16th st. unit b only: : replace (e) kitchen cabinets, new app;liances, minor bathroom remodeling/replace toilet tub, sink and tile | $10,000 |
| Dec 20, 2016 | Completed final sign-off Sep 2018 | 143 San Jose Av | add new bathroom at basement, 1st, 2nd and 3rd floors, remove and replace damaged roof rafter. strengthening 1st fl framing.Details
add new bathroom at basement, 1st, 2nd and 3rd floors, remove and replace damaged roof rafter. strengthening 1st fl framing. | $250,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2016 | 800 Lyon St | interior renovation of extg unit including expansion into extg storage space. work to include construction of new kitchen and 2.75 bathrooms. no exterior work and no increase to extg bldg sq footage.Details
interior renovation of extg unit including expansion into extg storage space. work to include construction of new kitchen and 2.75 bathrooms. no exterior work and no increase to extg bldg sq footage. | $80,000 |
| Apr 2, 2015 | Completed final sign-off Feb 2016 | 806 Lyon St | interior renovation of kitchen and 1/2 bath. relocating (e) full bathDetails
interior renovation of kitchen and 1/2 bath. relocating (e) full bath | $50,000 |
| Nov 10, 2010 | Completed final sign-off Dec 2010 | 53 Duncan St | install sink in kitchen and 2 sinks in bathroom and 2 toilet; repair damaged wood and fungus, repair foundation, replace deteriorated brick as needed, misc repairs as needed to doors and windows at rearDetails
install sink in kitchen and 2 sinks in bathroom and 2 toilet; repair damaged wood and fungus, repair foundation, replace deteriorated brick as needed, misc repairs as needed to doors and windows at rear | $4,000 |