Kanler Inc
- Based in
- Menlo Park
- On San Francisco permits
- Mar 2014 to Jul 2019
- Last 24 months
- 0 permits filed
58 permits since 2000: 33 completed, 1 in progress, 8 never finaled, 16 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 7 completed, 1 never finaled, 4 expired or cancelled. Typically 27 days from filing to permit and 699 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2019 | Completed final sign-off Nov 2019 | 55 Terrace Dr | remodel of sfd interior scope to include enlargement of (e) kitchen space, addition of interior staircase from 2nd to 3rd floor. remodel of bathrooms plus additional master suite on 3rd fl. exterior work to include replacement in-kind of windows plus removal of (e) kitchen door.Details
remodel of sfd interior scope to include enlargement of (e) kitchen space, addition of interior staircase from 2nd to 3rd floor. remodel of bathrooms plus additional master suite on 3rd fl. exterior work to include replacement in-kind of windows plus removal of (e) kitchen door. | $150,000 |
| Oct 30, 2018 | Expired or cancelled withdrawn Nov 2022 | 121 Gates St | comply w/ n.o.v's 201886411, 201888211 and 201767361. legalization of unlawful residential demo and replacement of previous (e) 2-story single fam res w/ (n) 2-story single fam res of same envelope & characteristics. stairs related construction as wellDetails
comply w/ n.o.v's 201886411, 201888211 and 201767361. legalization of unlawful residential demo and replacement of previous (e) 2-story single fam res w/ (n) 2-story single fam res of same envelope & characteristics. stairs related construction as well | $320,000 |
| May 21, 2018 | Expired or cancelled revoked Aug 2018 | 121 Gates St | to comply with nov #201767361; removal of (e) interior walls, post, fixtures, and finishes and construction of (n) interior walls, doors, stair, fixtures and finshes. exterior work includes (n) windows, door and deck stair, and repair to (e) fire damaged roof, balcony and wall,Details
to comply with nov #201767361; removal of (e) interior walls, post, fixtures, and finishes and construction of (n) interior walls, doors, stair, fixtures and finshes. exterior work includes (n) windows, door and deck stair, and repair to (e) fire damaged roof, balcony and wall, | $300,000 |
| Jan 4, 2018 | Never finaled issued Feb 2018, no final | 313 Castro St | revision to app#201708225549, refer (3) - demolish the bathroom on the 2nd floor and re-framing the extg deck and deck stair on the 2nd floor.Details
revision to app#201708225549, refer (3) - demolish the bathroom on the 2nd floor and re-framing the extg deck and deck stair on the 2nd floor. | $45,000 |
| Dec 7, 2017 | Completed final sign-off May 2020 | 869 Alvarado St | convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundationsDetails
convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundations | $600,000 |
| Oct 27, 2017 | Completed final sign-off Jun 2022 | 237 14th Av | intr&extr remodel. incl conversion bsmt(g/fl)space into a living space, addition to 1st & 2nd fl.living space on west facing side of(e)bldg towards(e)backyard.add a deck on 1/fl & new balcony on 2/fl.enclosure (e)entry staircase w/ 3 skylights.Details
intr&extr remodel. incl conversion bsmt(g/fl)space into a living space, addition to 1st & 2nd fl.living space on west facing side of(e)bldg towards(e)backyard.add a deck on 1/fl & new balcony on 2/fl.enclosure (e)entry staircase w/ 3 skylights. | $248,000 |
| Jul 11, 2017 | Completed final sign-off Sep 2019 | 39 Dolores Tr | int/ext renovation: interior: include relocation of int walls & stairs, and new elevator. exterior: includes replacement of all windows, (n) cement plaster finish throughout and (n) rear stairs, (n) roof deck, relocate kitchen to gr. fl. add living rm, dining rm, full bathrm to gr fl.Details
int/ext renovation: interior: include relocation of int walls & stairs, and new elevator. exterior: includes replacement of all windows, (n) cement plaster finish throughout and (n) rear stairs, (n) roof deck, relocate kitchen to gr. fl. add living rm, dining rm, full bathrm to gr fl. | $280,000 |
| May 1, 2017 | Expired or cancelled expired Sep 2018 | 313 Castro St | revision to pa 2017-0126-7992, revision to stairs and foundationDetails
revision to pa 2017-0126-7992, revision to stairs and foundation | $40,000 |
| Mar 24, 2017 | Completed final sign-off Nov 2017 | 85 Aquavista Wy | revision to pa#201612306348 at 2/f: enlgarge master bedroom window, replace (e) front window in-kind w/ wood window, change bathroom layout, new recessed celing. at 1/f, remove window, r/r (e) interior stairs in-kind, (n) retaining wall 3ft in ht.Details
revision to pa#201612306348 at 2/f: enlgarge master bedroom window, replace (e) front window in-kind w/ wood window, change bathroom layout, new recessed celing. at 1/f, remove window, r/r (e) interior stairs in-kind, (n) retaining wall 3ft in ht. | $7,000 |
| Dec 30, 2016 | Completed final sign-off Nov 2017 | 85 Aquavista Wy | 1st flr, remodel (e)floor space for one new bathrm,family,laundry & 2 bedrms.modify/enlarge (e)interior stair. 2nd flr remodel(e)kitchen,dining,bath & living.enlarge master bedrm & relocate bath,new windows & skylight.Details
1st flr, remodel (e)floor space for one new bathrm,family,laundry & 2 bedrms.modify/enlarge (e)interior stair. 2nd flr remodel(e)kitchen,dining,bath & living.enlarge master bedrm & relocate bath,new windows & skylight. | $80,000 |
| Jun 24, 2016 | Expired or cancelled expired Sep 2018 | 4369 21st St | revision to pa 2014-0813-3729 & 2015-1120-3176 - due to head clearance issue stairs from 2nd level is out from 21-2" west wall. relocated bathroom on attic level with dormer 6'x8' dormer is located with 15'-8" from front wall & 3'-1" from property wall. new island with sink in the kitchen. two newDetails
revision to pa 2014-0813-3729 & 2015-1120-3176 - due to head clearance issue stairs from 2nd level is out from 21-2" west wall. relocated bathroom on attic level with dormer 6'x8' dormer is located with 15'-8" from front wall & 3'-1" from property wall. new island with sink in the kitchen. two new | |
| Dec 7, 2015 | Completed final sign-off Jun 2020 | 323 Madrid St | addition of 283 sq. ft. habitable space & 299 sq. ft. garage on 1st floor. scope of work includes minor demolition & construction of 2 bedrooms, 1 bathroom, interior stairs & entry deck.Details
addition of 283 sq. ft. habitable space & 299 sq. ft. garage on 1st floor. scope of work includes minor demolition & construction of 2 bedrooms, 1 bathroom, interior stairs & entry deck. | $180,000 |