Back to kitchen remodel contractors
Kanler Inc
- Based in
- Menlo Park
- On San Francisco permits
- Mar 2014 to Jul 2019
- Last 24 months
- 0 permits filed
58 permits since 2000: 33 completed, 1 in progress, 8 never finaled, 16 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 13 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 70 days from filing to permit and 418 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2019 | In progress issued Oct 2024 | 1300 44th Av | add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit.Details
add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit. | $90,000 |
| May 10, 2019 | Completed final sign-off Mar 2021 | 1575 22nd Av | remodel of extg bathroom in 1st floor level.remodel of extg kitchen on 2nd level. remodel of extg bathroom on 3rd floor level. replace garage door with new garage door. no change to windows. no change to exterior elevations.Details
remodel of extg bathroom in 1st floor level.remodel of extg kitchen on 2nd level. remodel of extg bathroom on 3rd floor level. replace garage door with new garage door. no change to windows. no change to exterior elevations. | $70,000 |
| Jan 28, 2019 | Completed final sign-off Nov 2019 | 55 Terrace Dr | remodel of sfd interior scope to include enlargement of (e) kitchen space, addition of interior staircase from 2nd to 3rd floor. remodel of bathrooms plus additional master suite on 3rd fl. exterior work to include replacement in-kind of windows plus removal of (e) kitchen door.Details
remodel of sfd interior scope to include enlargement of (e) kitchen space, addition of interior staircase from 2nd to 3rd floor. remodel of bathrooms plus additional master suite on 3rd fl. exterior work to include replacement in-kind of windows plus removal of (e) kitchen door. | $150,000 |
| Dec 3, 2018 | Completed final sign-off Feb 2020 | 2786 42nd Av | kitchen remodel, upper bath remodel, conversion of (e) unfinished ground fl space to add (2) bedrooms & (1) new bath, replace (e) windows on the front facade, enlarging two e(e) windows at rear facade & adding (1) new window to rear facadeDetails
kitchen remodel, upper bath remodel, conversion of (e) unfinished ground fl space to add (2) bedrooms & (1) new bath, replace (e) windows on the front facade, enlarging two e(e) windows at rear facade & adding (1) new window to rear facade | $110,000 |
| Nov 21, 2018 | Completed final sign-off Jan 2020 | 125 Gilbert St | r&r hardwood floor, kitchen appliances & cabinet upgrade, master bathroom , powder room & common bathorom , r&r like for like all work in unit no work in common areaDetails
r&r hardwood floor, kitchen appliances & cabinet upgrade, master bathroom , powder room & common bathorom , r&r like for like all work in unit no work in common area | $85,000 |
| Jun 7, 2018 | Completed final sign-off Jul 2019 | 86 Midcrest Wy | alterations including kitchen and bath remodels, streets window and door replacement, mech upgrades, voluntary seismic bolt and braceDetails
alterations including kitchen and bath remodels, streets window and door replacement, mech upgrades, voluntary seismic bolt and brace | $211,099 |
| Feb 2, 2018 | Completed final sign-off Jul 2018 | 1010 Silliman St | remodel kitchen with new skylight. replace 3 windows in existing openingsDetails
remodel kitchen with new skylight. replace 3 windows in existing openings | $35,000 |
| Jan 18, 2018 | Expired or cancelled expired Sep 2019 | 39 Dolores Tr | installation of ventless dryer in the first floor kitchen. revision to app#201707111584Details
installation of ventless dryer in the first floor kitchen. revision to app#201707111584 | $2,000 |
| Dec 7, 2017 | Completed final sign-off May 2020 | 869 Alvarado St | convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundationsDetails
convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundations | $600,000 |
| Aug 18, 2017 | Never finaled issued Feb 2018, no final | 313 Castro St | convert (e) 1st floor to a 2nd unit. add 2 bedrooms, 1 bathroom, kitchen, living area & dining area in the 1st floor.Details
convert (e) 1st floor to a 2nd unit. add 2 bedrooms, 1 bathroom, kitchen, living area & dining area in the 1st floor. | $70,000 |
| Jul 11, 2017 | Completed final sign-off Sep 2019 | 39 Dolores Tr | int/ext renovation: interior: include relocation of int walls & stairs, and new elevator. exterior: includes replacement of all windows, (n) cement plaster finish throughout and (n) rear stairs, (n) roof deck, relocate kitchen to gr. fl. add living rm, dining rm, full bathrm to gr fl.Details
int/ext renovation: interior: include relocation of int walls & stairs, and new elevator. exterior: includes replacement of all windows, (n) cement plaster finish throughout and (n) rear stairs, (n) roof deck, relocate kitchen to gr. fl. add living rm, dining rm, full bathrm to gr fl. | $280,000 |
| Feb 7, 2017 | Completed final sign-off Jul 2020 | 311 30th St | horizontal addition of habitable space in rear yard & an internal remodel of kitchen, bathroom & laundry room. the (e) garage will be expanded. there will be no work on the front of the house.Details
horizontal addition of habitable space in rear yard & an internal remodel of kitchen, bathroom & laundry room. the (e) garage will be expanded. there will be no work on the front of the house. | $200,000 |
| Jan 26, 2017 | Never finaled issued Feb 2017, no final | 313 Castro St | remodel the dining room and kitchen, add new bathroom at main floor; remove the chimney (fire place); convert bedroom to dining room; convert great room to office roomDetails
remodel the dining room and kitchen, add new bathroom at main floor; remove the chimney (fire place); convert bedroom to dining room; convert great room to office room | $35,000 |
| Dec 30, 2016 | Completed final sign-off Nov 2017 | 85 Aquavista Wy | 1st flr, remodel (e)floor space for one new bathrm,family,laundry & 2 bedrms.modify/enlarge (e)interior stair. 2nd flr remodel(e)kitchen,dining,bath & living.enlarge master bedrm & relocate bath,new windows & skylight.Details
1st flr, remodel (e)floor space for one new bathrm,family,laundry & 2 bedrms.modify/enlarge (e)interior stair. 2nd flr remodel(e)kitchen,dining,bath & living.enlarge master bedrm & relocate bath,new windows & skylight. | $80,000 |
| Aug 26, 2016 | Completed final sign-off Apr 2017 | 2859 Mission St | change of use/occupancy from m to b occupancy: retail to restaurant at ground floor. new kitchen and prep area; new transaction counter and seatingDetails
change of use/occupancy from m to b occupancy: retail to restaurant at ground floor. new kitchen and prep area; new transaction counter and seating | $75,995 |
| Jul 28, 2016 | Completed final sign-off Aug 2017 | 866 Junipero Serra Bl | crawl space seismic upgrade. level 1 - add bath, bedroom & laundry room; level 2 - kitchen remodel; level 3 & 4 combine 2 baths to one bath, remodel master suite.Details
crawl space seismic upgrade. level 1 - add bath, bedroom & laundry room; level 2 - kitchen remodel; level 3 & 4 combine 2 baths to one bath, remodel master suite. | $45,000 |
| Jun 24, 2016 | Expired or cancelled expired Sep 2018 | 4369 21st St | revision to pa 2014-0813-3729 & 2015-1120-3176 - due to head clearance issue stairs from 2nd level is out from 21-2" west wall. relocated bathroom on attic level with dormer 6'x8' dormer is located with 15'-8" from front wall & 3'-1" from property wall. new island with sink in the kitchen. two newDetails
revision to pa 2014-0813-3729 & 2015-1120-3176 - due to head clearance issue stairs from 2nd level is out from 21-2" west wall. relocated bathroom on attic level with dormer 6'x8' dormer is located with 15'-8" from front wall & 3'-1" from property wall. new island with sink in the kitchen. two new | |
| Oct 10, 2014 | Completed final sign-off Mar 2018 | 1430 36th Av | on 1/f: add a family room, 3 bedrooms, 1 & a half bath,on 2nd floor:add a bath, relocate bedrooms, convert (e) bedrooms to a study, remodel kitchenDetails
on 1/f: add a family room, 3 bedrooms, 1 & a half bath,on 2nd floor:add a bath, relocate bedrooms, convert (e) bedrooms to a study, remodel kitchen | $70,000 |