Kai Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to Aug 2026
- Last 24 months
- 11 permits filed
37 permits since 2000: 23 completed, 11 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 6 completed, 2 in progress, 1 never finaled. Typically 62 days from filing to permit and 376 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2026 | In progress issued May 2026 | 2801 35th Av | revision to pa # 202603308533: relocate (e) kitchen, remodel (e) bathroom. add 1 new bathroom & repair (e) interior staircase in-kind. replace (e) sheetrock w/ new. all work on 2/f.Details
revision to pa # 202603308533: relocate (e) kitchen, remodel (e) bathroom. add 1 new bathroom & repair (e) interior staircase in-kind. replace (e) sheetrock w/ new. all work on 2/f. | $123,000 |
| Oct 2, 2025 | In progress issued Dec 2025 | 391 Joost Av | interior remodel at 1st&2nd floors; relocate stairway at 1st &2nd, & basement; kitchen remodel; add new powder room at 1st floor; add new bathroom and bedroom (facing rear yard) at 2nd floor. relocate e) bath, lower ceiling ht @ 1st/f, strengthening & n) guardrail @ roof deck. n) unwalkable balconyDetails
interior remodel at 1st&2nd floors; relocate stairway at 1st &2nd, & basement; kitchen remodel; add new powder room at 1st floor; add new bathroom and bedroom (facing rear yard) at 2nd floor. relocate e) bath, lower ceiling ht @ 1st/f, strengthening & n) guardrail @ roof deck. n) unwalkable balcony | $40,000 |
| Dec 29, 2023 | Completed final sign-off Apr 2026 | 301 Phelan Av | interior remodel - 1st fl. add two batroom, add two bedrooms and family room, replace one window 2nd fl. reconfigure interior staircase to 2nd staircase, relocate the (e) closet, replace windowDetails
interior remodel - 1st fl. add two batroom, add two bedrooms and family room, replace one window 2nd fl. reconfigure interior staircase to 2nd staircase, relocate the (e) closet, replace window | $50,000 |
| Apr 1, 2022 | Completed final sign-off May 2025 | 1737 Mason St | front building - repair exterior rear stairs to comply with section 604 of the sf housing code (in-kind) less than 50%Details
front building - repair exterior rear stairs to comply with section 604 of the sf housing code (in-kind) less than 50% | $10,000 |
| Sep 5, 2020 | Completed final sign-off Dec 2020 | 1527 Judah St | remove & replace existing rear egress stair; to comply with nov#202034584.Details
remove & replace existing rear egress stair; to comply with nov#202034584. | $25,000 |
| Mar 11, 2020 | Completed final sign-off Dec 2022 | 205 Clipper St | 1/f: add 2 bedrms, 2 bathrms, a wic, entertainment, laundry rm & wetbar. in-fill lightwell @ leftside of bldg. (n) int stair to connect 1st & 2nd fl. 2/f: reconfig layout w/1 bedrm, 1 bathrm, 1 powder, laundry, den, kitchen, living, dining & family rms. (n) int stair to 2nd & 3rd fl. 3/f: turnDetails
1/f: add 2 bedrms, 2 bathrms, a wic, entertainment, laundry rm & wetbar. in-fill lightwell @ leftside of bldg. (n) int stair to connect 1st & 2nd fl. 2/f: reconfig layout w/1 bedrm, 1 bathrm, 1 powder, laundry, den, kitchen, living, dining & family rms. (n) int stair to 2nd & 3rd fl. 3/f: turn | $60,000 |
| Mar 6, 2020 | Completed final sign-off May 2022 | 3621 Broderick St | remove existing stairs at rear deck. maher not req.Details
remove existing stairs at rear deck. maher not req. | $15,000 |
| May 9, 2019 | Never finaled issued Jul 2021, no final | 279 Howth St | horizontal addition: 1st flr- add attached garage,(1) 3-fixture bath, (2) bdrms, relocate interior stairs to 2nd fl. 2nd flr- relocate main entrance, add (1) office, (2) bdrms, (1) 3-fixture bath, relocate int. stairs to 3rd fl, add deck to backyard. 3rd flr- add (3) 3-fixture bath, (2) bdrms,Details
horizontal addition: 1st flr- add attached garage,(1) 3-fixture bath, (2) bdrms, relocate interior stairs to 2nd fl. 2nd flr- relocate main entrance, add (1) office, (2) bdrms, (1) 3-fixture bath, relocate int. stairs to 3rd fl, add deck to backyard. 3rd flr- add (3) 3-fixture bath, (2) bdrms, | $150,000 |
| Apr 5, 2018 | Completed final sign-off Jul 2018 | 450 12th Av | revision to pa 2014-1024-9864, create 1 hr rated stair shaft & 1 hr rated egress. remove (e) sprinkler. travel distance to stair enclosure from 2/f & 3/f less than 75 feet.Details
revision to pa 2014-1024-9864, create 1 hr rated stair shaft & 1 hr rated egress. remove (e) sprinkler. travel distance to stair enclosure from 2/f & 3/f less than 75 feet. | $1,000 |