Back to bathroom remodel contractors
Kai Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to Aug 2026
- Last 24 months
- 11 permits filed
37 permits since 2000: 23 completed, 11 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 8 completed, 7 in progress, 1 never finaled. Typically 29 days from filing to permit and 406 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 1327 Palou Av | revision to 202606294093; 1) revise closet at 2nd flr. 2) relocate side door at ground flr. 3) construct family room. office, storage room. one full bathroom and install wet bar at basement.Details
revision to 202606294093; 1) revise closet at 2nd flr. 2) relocate side door at ground flr. 3) construct family room. office, storage room. one full bathroom and install wet bar at basement. | $130,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 1327 Palou Av | remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2/f. convert (e) storage room t o2 bedroom. construct media room, 1 full bath, & install wetbar at g/f.Details
remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2/f. convert (e) storage room t o2 bedroom. construct media room, 1 full bath, & install wetbar at g/f. | $189,000 |
| May 7, 2026 | In progress issued May 2026 | 2801 35th Av | revision to pa # 202603308533: relocate (e) kitchen, remodel (e) bathroom. add 1 new bathroom & repair (e) interior staircase in-kind. replace (e) sheetrock w/ new. all work on 2/f.Details
revision to pa # 202603308533: relocate (e) kitchen, remodel (e) bathroom. add 1 new bathroom & repair (e) interior staircase in-kind. replace (e) sheetrock w/ new. all work on 2/f. | $123,000 |
| Mar 30, 2026 | In progress issued Mar 2026 | 2801 35th Av | (1) existing kitchen and (1) existing bathroom remodel on 2/f. no change in layout. all work in kind.Details
(1) existing kitchen and (1) existing bathroom remodel on 2/f. no change in layout. all work in kind. | $35,000 |
| Nov 25, 2025 | In progress issued Jan 2026 | 1741 Mason St | unit 1741- 1st floor reconfigure bathroom layout (2) convert (e) powder room into laundry room. exchange locations of kitchen and office per plans. convert laundry room into (n) sun room with closet. remove two closets between 2x (e) bedrooms and install (n) bi window and portion of wall to (n)doorDetails
unit 1741- 1st floor reconfigure bathroom layout (2) convert (e) powder room into laundry room. exchange locations of kitchen and office per plans. convert laundry room into (n) sun room with closet. remove two closets between 2x (e) bedrooms and install (n) bi window and portion of wall to (n)door | $100,000 |
| Oct 2, 2025 | In progress issued Dec 2025 | 391 Joost Av | interior remodel at 1st&2nd floors; relocate stairway at 1st &2nd, & basement; kitchen remodel; add new powder room at 1st floor; add new bathroom and bedroom (facing rear yard) at 2nd floor. relocate e) bath, lower ceiling ht @ 1st/f, strengthening & n) guardrail @ roof deck. n) unwalkable balconyDetails
interior remodel at 1st&2nd floors; relocate stairway at 1st &2nd, & basement; kitchen remodel; add new powder room at 1st floor; add new bathroom and bedroom (facing rear yard) at 2nd floor. relocate e) bath, lower ceiling ht @ 1st/f, strengthening & n) guardrail @ roof deck. n) unwalkable balcony | $40,000 |
| Apr 10, 2025 | Completed final sign-off Jul 2025 | 1777 07th Av | unit 2 and 4: bathroom remodeling in kindDetails
unit 2 and 4: bathroom remodeling in kind | $8,000 |
| Feb 23, 2024 | In progress issued Mar 2024 | 1737 Mason St | 3rd fl unit interior remodel: 1) reconfig area btwn (e) storage, (e) kitchen & (e) laundry to become a kitchen w/den and add (n) bath. 2) remove wall btwn dining & living. 3) replace water heater w/ tankless water heater. 4) replace furnace with mini-split system 5) add 4 skylght 6) replace fdnDetails
3rd fl unit interior remodel: 1) reconfig area btwn (e) storage, (e) kitchen & (e) laundry to become a kitchen w/den and add (n) bath. 2) remove wall btwn dining & living. 3) replace water heater w/ tankless water heater. 4) replace furnace with mini-split system 5) add 4 skylght 6) replace fdn | $30,000 |
| Jul 21, 2023 | Completed final sign-off Sep 2023 | 1517 Waller St | unit 4: remodel (1) kitchen, (1) bathroom, and replace (11) windows at rear (not visible from street). all work in kind.Details
unit 4: remodel (1) kitchen, (1) bathroom, and replace (11) windows at rear (not visible from street). all work in kind. | $22,000 |
| Aug 30, 2022 | Completed final sign-off Mar 2023 | 2470 32nd Av | comply with nov 202289653. remove two unpermitted bedrooms and bathroom on ground floor.Details
comply with nov 202289653. remove two unpermitted bedrooms and bathroom on ground floor. | $3,000 |
| Feb 23, 2022 | Completed final sign-off Aug 2025 | 1741 Mason St | 3rd fl: reconfigure interior layout with one bedrm, one office, one 3-fixture bathroom, kitchen & living rm. (rear bldg work only.)Details
3rd fl: reconfigure interior layout with one bedrm, one office, one 3-fixture bathroom, kitchen & living rm. (rear bldg work only.) | $60,000 |
| May 9, 2019 | Never finaled issued Jul 2021, no final | 279 Howth St | horizontal addition: 1st flr- add attached garage,(1) 3-fixture bath, (2) bdrms, relocate interior stairs to 2nd fl. 2nd flr- relocate main entrance, add (1) office, (2) bdrms, (1) 3-fixture bath, relocate int. stairs to 3rd fl, add deck to backyard. 3rd flr- add (3) 3-fixture bath, (2) bdrms,Details
horizontal addition: 1st flr- add attached garage,(1) 3-fixture bath, (2) bdrms, relocate interior stairs to 2nd fl. 2nd flr- relocate main entrance, add (1) office, (2) bdrms, (1) 3-fixture bath, relocate int. stairs to 3rd fl, add deck to backyard. 3rd flr- add (3) 3-fixture bath, (2) bdrms, | $150,000 |
| Feb 21, 2019 | Completed final sign-off Mar 2022 | 1512 California St | 4th flr- reconfigure interior layout for units f & g w/ two bedrooms, two 3-fixtures bath, living/dining room & kitchen per plans. add two skylights & 3 window replcmeent englarging not visible from public right of way.Details
4th flr- reconfigure interior layout for units f & g w/ two bedrooms, two 3-fixtures bath, living/dining room & kitchen per plans. add two skylights & 3 window replcmeent englarging not visible from public right of way. | $80,000 |
| Dec 30, 2016 | Completed final sign-off Oct 2018 | 420 Baker St | interior remodel unit 3: convert 1 bedroom to 2 bedrooms apt, relocation of kitchen, remodel bathroom, add powder room and laundry. no structural workDetails
interior remodel unit 3: convert 1 bedroom to 2 bedrooms apt, relocation of kitchen, remodel bathroom, add powder room and laundry. no structural work | $20,000 |
| Jul 21, 2016 | Completed final sign-off Sep 2020 | 160 San Carlos St | (unit legalize ord 43-14.) legalize (e) unit on grd flr at rear of building (unit#7) per plan. living room, kitche, two bedrooms, & one bath.add one (n) unit on grd fl at front of bldg (unit#8) per ord#30-15. one storage, living room, kitchen, bedroom, full bath. (soft story pa#201606029004.Details
(unit legalize ord 43-14.) legalize (e) unit on grd flr at rear of building (unit#7) per plan. living room, kitche, two bedrooms, & one bath.add one (n) unit on grd fl at front of bldg (unit#8) per ord#30-15. one storage, living room, kitchen, bedroom, full bath. (soft story pa#201606029004. | $60,000 |
| Oct 24, 2014 | Completed final sign-off Jul 2018 | 450 12th Av | horizontal addition at rear; 2 bedrooms, 1 bath on 1st; 1 sunroom, 1 bedroom, 1 bath on 2nd; 1 sunroom, 1 bedroom, 1 bath on 3rd fl.Details
horizontal addition at rear; 2 bedrooms, 1 bath on 1st; 1 sunroom, 1 bedroom, 1 bath on 2nd; 1 sunroom, 1 bedroom, 1 bath on 3rd fl. | $100,000 |