Kadon Construction
- Based in
- Burlingame
- On San Francisco permits
- Dec 2017 to Sep 2026
- Last 24 months
- 2 permits filed
19 permits since 2000: 18 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 108 days from filing to permit and 355 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2022 | Completed final sign-off Dec 2022 | 7 Danvers St | 7a danvers street: rev to pa202102104427 sheet a-2: side yard stair access revision to have a landingDetails
7a danvers street: rev to pa202102104427 sheet a-2: side yard stair access revision to have a landing | $500 |
| Jun 24, 2021 | Completed final sign-off May 2023 | 1616 Shrader St | 1st floor: new full bath, new partitions, electrical, lighting, plumbing, mech, floor & ceiling surfaces, new doors and window as well. 2nd floor: gas fire place, nw front door. (in extg location). new deck, stair, fenceDetails
1st floor: new full bath, new partitions, electrical, lighting, plumbing, mech, floor & ceiling surfaces, new doors and window as well. 2nd floor: gas fire place, nw front door. (in extg location). new deck, stair, fence | $150,000 |
| Apr 15, 2021 | Completed final sign-off Jan 2022 | 43 Buena Vista Tr | replace an (e) front entry stair including new painted wood stair and painted antique guardrail. removal of non histroic reinforced concrete elements. new permeable pavers with planting in b/t each paver. new planting beds. new painted wood landing at entry door to bring entry code.Details
replace an (e) front entry stair including new painted wood stair and painted antique guardrail. removal of non histroic reinforced concrete elements. new permeable pavers with planting in b/t each paver. new planting beds. new painted wood landing at entry door to bring entry code. | $3,000 |
| May 20, 2019 | Completed final sign-off Jan 2022 | 43 Buena Vista Tr | interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg)Details
interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg) | $1,200,000 |