Back to kitchen remodel contractors
Kadon Construction
- Based in
- Burlingame
- On San Francisco permits
- Dec 2017 to Sep 2026
- Last 24 months
- 2 permits filed
19 permits since 2000: 18 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 70 days from filing to permit and 477 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2025 | Completed final sign-off Jul 2025 | 273 Dolores St | unit #273: full bathroom remodel in-kind, full kitchen remodel in-kind. unit #275: full bathroom remodel in-kind, full kitchen remodel in-kind.Details
unit #273: full bathroom remodel in-kind, full kitchen remodel in-kind. unit #275: full bathroom remodel in-kind, full kitchen remodel in-kind. | $40,000 |
| Dec 29, 2023 | Completed final sign-off May 2025 | 1616 Shrader St | renovate 2 full baths & laundry at 3/f, w/new floors throughtout, replace 2 fireplaces w/gas appliance, kitchen remodel and 2 new openings at 2/f, select new windows, new interior doors, new lighting and plumb fixtures @ areas altered. removal of 2 fire escapes, w/new sprinklers along path of egressDetails
renovate 2 full baths & laundry at 3/f, w/new floors throughtout, replace 2 fireplaces w/gas appliance, kitchen remodel and 2 new openings at 2/f, select new windows, new interior doors, new lighting and plumb fixtures @ areas altered. removal of 2 fire escapes, w/new sprinklers along path of egress | $84,000 |
| Feb 10, 2021 | Completed final sign-off Jan 2023 | 7 Danvers St | remodel of an extg adu unit @ ground/basement level (sloped site) work includes kitchen remodel with plmg fixtures, finishes, new hood & exhaust. replacing extg bath vanity, vanity sink faucet & lighting. nw lighting in studio. nw water heater to be located in basemet space with other extg waterDetails
remodel of an extg adu unit @ ground/basement level (sloped site) work includes kitchen remodel with plmg fixtures, finishes, new hood & exhaust. replacing extg bath vanity, vanity sink faucet & lighting. nw lighting in studio. nw water heater to be located in basemet space with other extg water | $30,000 |
| May 20, 2019 | Completed final sign-off Jan 2022 | 43 Buena Vista Tr | interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg)Details
interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg) | $1,200,000 |