Back to kitchen remodel contractors
K Lui General Construction Co.
- Based in
- Millbrae
- On San Francisco permits
- Sep 2009 to May 2025
- Last 24 months
- 1 permit filed
97 permits since 2000: 88 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2011 | Completed final sign-off Dec 2011 | 1626 North Point St | unit # 101 - kitchen remodel: replace cabinet hood/fan. dgi outlet, count4er, faucet, sink, ceiling light, microwaves, ranges, dishwasherDetails
unit # 101 - kitchen remodel: replace cabinet hood/fan. dgi outlet, count4er, faucet, sink, ceiling light, microwaves, ranges, dishwasher | $9,000 |
| Sep 28, 2010 | Completed final sign-off Mar 2014 | 1731 15th St | life safety improvements including 2 enclosed stairways & lightwell access to bedrooms in rear. new bathrooms & community kitchens. new elevator. new roof terrace. increase number of rooms from 27 to 52.Details
life safety improvements including 2 enclosed stairways & lightwell access to bedrooms in rear. new bathrooms & community kitchens. new elevator. new roof terrace. increase number of rooms from 27 to 52. | $780,000 |
| Jul 7, 2010 | Completed final sign-off Nov 2010 | 655 05th Av | kitchen remodel: replace cab. hood/fan. outlet, switches, counter, tile flr. disposal, faucet, sink, ceiling light, diswasher, dryer, stove, washer. bath remodel: replaces tub sink, faucet tile, cab. clg. light, towel bar, toilet, swith, outlet, fan/light unit.Details
kitchen remodel: replace cab. hood/fan. outlet, switches, counter, tile flr. disposal, faucet, sink, ceiling light, diswasher, dryer, stove, washer. bath remodel: replaces tub sink, faucet tile, cab. clg. light, towel bar, toilet, swith, outlet, fan/light unit. | $12,000 |
| May 3, 2010 | Completed final sign-off Jul 2010 | 2361 28th Av | kitchen remodel: replace cabinets, hood fan,outlet, switch, counter, hardwood floor, disposal, faucets, sink, dishwasher, cooktop, oven. lighting fixtures to comply with title energy codes.Details
kitchen remodel: replace cabinets, hood fan,outlet, switch, counter, hardwood floor, disposal, faucets, sink, dishwasher, cooktop, oven. lighting fixtures to comply with title energy codes. | $9,239 |
| Nov 18, 2009 | Completed final sign-off Jan 2010 | 217 Virginia Av | kitchen: replace cabinet, sink, counter top, faucet, outlet(gfi) switch, light, dishwasher & stove. in-kind, non-structural.Details
kitchen: replace cabinet, sink, counter top, faucet, outlet(gfi) switch, light, dishwasher & stove. in-kind, non-structural. | $10,800 |