Back to bathroom remodel contractors
K Lui General Construction Co.
- Based in
- Millbrae
- On San Francisco permits
- Sep 2009 to May 2025
- Last 24 months
- 1 permit filed
97 permits since 2000: 88 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 2 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2024 | In progress filed May 2024, not yet issued | 570 Munich St | remove (1) bar sink. remove (1) sink (1) toilet (1) bathtub (bathroom only)Details
remove (1) bar sink. remove (1) sink (1) toilet (1) bathtub (bathroom only) | $1,000 |
| Sep 8, 2014 | Completed final sign-off Mar 2015 | 305 02nd Av | accessibility compliance triggered by soft story retrofit. upgrade bathroom to full accessible. soft story building permit pa#201409085626Details
accessibility compliance triggered by soft story retrofit. upgrade bathroom to full accessible. soft story building permit pa#201409085626 | $6,000 |
| Sep 28, 2010 | Completed final sign-off Mar 2014 | 1731 15th St | life safety improvements including 2 enclosed stairways & lightwell access to bedrooms in rear. new bathrooms & community kitchens. new elevator. new roof terrace. increase number of rooms from 27 to 52.Details
life safety improvements including 2 enclosed stairways & lightwell access to bedrooms in rear. new bathrooms & community kitchens. new elevator. new roof terrace. increase number of rooms from 27 to 52. | $780,000 |
| Jul 7, 2010 | Completed final sign-off Nov 2010 | 655 05th Av | kitchen remodel: replace cab. hood/fan. outlet, switches, counter, tile flr. disposal, faucet, sink, ceiling light, diswasher, dryer, stove, washer. bath remodel: replaces tub sink, faucet tile, cab. clg. light, towel bar, toilet, swith, outlet, fan/light unit.Details
kitchen remodel: replace cab. hood/fan. outlet, switches, counter, tile flr. disposal, faucet, sink, ceiling light, diswasher, dryer, stove, washer. bath remodel: replaces tub sink, faucet tile, cab. clg. light, towel bar, toilet, swith, outlet, fan/light unit. | $12,000 |
| Sep 14, 2009 | Completed final sign-off Dec 2009 | 1850 Sacramento St | bathroom upgrade: replace toilet, sink, faucet ceiling light, switch. gfi outlet, towel bar tile.Details
bathroom upgrade: replace toilet, sink, faucet ceiling light, switch. gfi outlet, towel bar tile. | $4,500 |