Back to kitchen remodel contractors
K L Construction Inc./Pls Check Id./Note
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Aug 2013
- Last 24 months
- 0 permits filed
87 permits since 2000: 82 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
34 kitchen remodel permits: 33 completed, 1 never finaled. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2013 | Completed final sign-off Jul 2013 | 136 Whitney St | remodel (e) kitchen - new cabinets, fixtures and appliances. remodel (e) bathroom - new fixtures and finishes.Details
remodel (e) kitchen - new cabinets, fixtures and appliances. remodel (e) bathroom - new fixtures and finishes. | $18,277 |
| Mar 22, 2013 | Completed final sign-off Oct 2013 | 726 23rd Av | remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flrDetails
remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flr | $15,000 |
| Jan 23, 2013 | Completed final sign-off May 2013 | 218 Molimo Dr | remodel kitchen & bathroom, cabinet, countertop, sink & appliances & light @ kitchen, tiles, tub, sink, toilet & light @ bathroom. replace one window in kind at the back of house.Details
remodel kitchen & bathroom, cabinet, countertop, sink & appliances & light @ kitchen, tiles, tub, sink, toilet & light @ bathroom. replace one window in kind at the back of house. | $16,000 |
| Aug 28, 2012 | Completed final sign-off Oct 2012 | 630 06th Av | change cabinets and upgrade for the kitchen.Details
change cabinets and upgrade for the kitchen. | $9,000 |
| Aug 6, 2012 | Completed final sign-off Nov 2012 | 286 Bella Vista Wy | remodel kitchen & laundry room. replace 1 window & door at rear wall. (window and door are not visible on the street).Details
remodel kitchen & laundry room. replace 1 window & door at rear wall. (window and door are not visible on the street). | $9,000 |
| Aug 1, 2012 | Completed final sign-off Nov 2012 | 208 Clement St | relocate e toilet to become a handicap accessible toilet. add a mop sink and a handsink in kitchen areaDetails
relocate e toilet to become a handicap accessible toilet. add a mop sink and a handsink in kitchen area | $10,000 |
| Jan 30, 2012 | Completed final sign-off Apr 2012 | 882 North Point St | revision to pa #201110046050 - relcoate sink/equipments location, deleted range, fryer grille & canopy hood. install new lighting for kitchen/dining area. comply w/complaint #200005263, 200005105 & 200005264.Details
revision to pa #201110046050 - relcoate sink/equipments location, deleted range, fryer grille & canopy hood. install new lighting for kitchen/dining area. comply w/complaint #200005263, 200005105 & 200005264. | $20,000 |
| Nov 14, 2011 | Completed final sign-off Apr 2012 | 3494 21st St | remodel 3 extg bathrooms. add door to garage at side from yard (not visible from street)repair extg rear stairs(not visible from street where work is done). general mep upgrades. add laundry room at kitchen. stair not a required exit.Details
remodel 3 extg bathrooms. add door to garage at side from yard (not visible from street)repair extg rear stairs(not visible from street where work is done). general mep upgrades. add laundry room at kitchen. stair not a required exit. | $35,301 |
| Oct 4, 2011 | Completed final sign-off Apr 2012 | 882 North Point St | upgrade ada restroom, add kitchen in ground floor & change a part of occupant retail space into black point cafe.Details
upgrade ada restroom, add kitchen in ground floor & change a part of occupant retail space into black point cafe. | $50,000 |
| Sep 30, 2011 | Completed final sign-off Apr 2012 | 3494 21st St | open wall between kitchen and dining. add beam and posts. remodel kitchen. remove non bearing wall at upstairs bedroom. add closet. widen misc closet doors. gen mep ugrades.Details
open wall between kitchen and dining. add beam and posts. remodel kitchen. remove non bearing wall at upstairs bedroom. add closet. widen misc closet doors. gen mep ugrades. | $9,700 |
| Sep 27, 2011 | Completed final sign-off Apr 2012 | 3494 21st St | remodel and replace kitchen cabinets and tile floor. some sheetrock about 20 sq ft on kitchen wall. for exploratory purpose. kitchen remodel will be under seperate permit.Details
remodel and replace kitchen cabinets and tile floor. some sheetrock about 20 sq ft on kitchen wall. for exploratory purpose. kitchen remodel will be under seperate permit. | $1,000 |
| Jul 1, 2011 | Completed final sign-off Nov 2011 | 906 Vallejo St | remodel one kitchen, 2 bathrooms, kitchen provide min 50% of light watts in h.e. light. bath: h.e. or "manual on" occupancy sensor.Details
remodel one kitchen, 2 bathrooms, kitchen provide min 50% of light watts in h.e. light. bath: h.e. or "manual on" occupancy sensor. | $22,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 2370 California St | remodel kitchen. no structural work.Details
remodel kitchen. no structural work. | $9,000 |
| Feb 18, 2011 | Completed final sign-off Apr 2011 | 787 Edinburgh St | remodel kitchen upstairs, no structure work, replace cabinet and new lighting comply with cec 150(k)Details
remodel kitchen upstairs, no structure work, replace cabinet and new lighting comply with cec 150(k) | $8,000 |
| Jun 22, 2010 | Completed final sign-off Dec 2010 | 355 Yerba Buena Av | remodel gr fl: add 1 bedroom, 1 bath. remodel bath and family room. remodel 2nd fl: kitchen and 2 bathsDetails
remodel gr fl: add 1 bedroom, 1 bath. remodel bath and family room. remodel 2nd fl: kitchen and 2 baths | $50,000 |
| Mar 18, 2010 | Completed final sign-off Feb 2011 | 3025 Ulloa St | second floor. remodel 2nd floor bathroom & kitchen, add 1 full bathroom @ 2nd fl.Details
second floor. remodel 2nd floor bathroom & kitchen, add 1 full bathroom @ 2nd fl. | $20,000 |
| Mar 2, 2010 | Never finaled issued Mar 2010, no final | 39 Cervantes Bl | remodel 1-kitchen & 2-bathrooms, 1-laundry room.no structure work @ 3rd. flr. replace dryer connect to existing duct, lighting per cec 150 (k).Details
remodel 1-kitchen & 2-bathrooms, 1-laundry room.no structure work @ 3rd. flr. replace dryer connect to existing duct, lighting per cec 150 (k). | $15,000 |
| Nov 13, 2009 | Completed final sign-off Feb 2010 | 3421 Geary Bl | interior alteration at unit 4 at 3rd fl. remodel (e) kitchen and bathroom, convert (e) living rm into two bedrooms. replace (e) 30" x 30" skylight. add new half bath as per planDetails
interior alteration at unit 4 at 3rd fl. remodel (e) kitchen and bathroom, convert (e) living rm into two bedrooms. replace (e) 30" x 30" skylight. add new half bath as per plan | $16,000 |
| Oct 2, 2009 | Completed final sign-off Dec 2009 | 1240 Willard St | remodel one kitchen and 1 1/2 bathroom. no structural workDetails
remodel one kitchen and 1 1/2 bathroom. no structural work | $15,000 |
| Sep 22, 2009 | Completed final sign-off Feb 2010 | 601 Van Ness Av | suite 2090: remodel law office's existing kitchenDetails
suite 2090: remodel law office's existing kitchen | $10,000 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 520 02nd Av | in response to notice of violation #200788916 to demolish (e) kitchen & bedrooms behind garages. legalize (e) ground flr. to have 1-bedroom, 1-full bathroom, 1-storage room, 1-family room & 2-car side by side parking in garage.Details
in response to notice of violation #200788916 to demolish (e) kitchen & bedrooms behind garages. legalize (e) ground flr. to have 1-bedroom, 1-full bathroom, 1-storage room, 1-family room & 2-car side by side parking in garage. | $15,000 |
| Mar 10, 2009 | Completed final sign-off Jul 2009 | 280 Anzavista Av | remodel kitchen, no structural work. no other work under this permit.Details
remodel kitchen, no structural work. no other work under this permit. | $8,000 |
| Dec 4, 2008 | Completed final sign-off Apr 2009 | 1263 Noe St | remodel kitchen. instal elec & plumbing fixtures, cabinets. change sink for bathroom. change tile & faucet for bathtub. keep toilet and bathtub. no structural work.Details
remodel kitchen. instal elec & plumbing fixtures, cabinets. change sink for bathroom. change tile & faucet for bathtub. keep toilet and bathtub. no structural work. | $17,188 |
| Nov 4, 2008 | Completed final sign-off Feb 2009 | 55 San Rafael Wy | remodel kitchen. change cabinets. electrical plugs & lights.Details
remodel kitchen. change cabinets. electrical plugs & lights. | $8,000 |
| Jul 7, 2008 | Completed final sign-off Oct 2008 | 355 Campbell Av | remodel (1) kitchen . no structural work, same location.Details
remodel (1) kitchen . no structural work, same location. | $6,000 |
| Jul 7, 2008 | Completed final sign-off Nov 2008 | 2663 23rd Av | remodel (1), (1) kitchen. no structural work. same location. no changes to window or door.Details
remodel (1), (1) kitchen. no structural work. same location. no changes to window or door. | $9,000 |
| Apr 28, 2008 | Completed final sign-off Jul 2008 | 3644 24th St | work @ unit# 3644 only. remodel kitchen. bathroom. laundry.Details
work @ unit# 3644 only. remodel kitchen. bathroom. laundry. | $20,000 |
| Mar 27, 2008 | Completed final sign-off Oct 2008 | 1105 Stanyan St | remodel 4 kitchens and 6 bathrooms for the building. non structural remodels. new lighting. 50% of kitchen light watts shall be of high efficacy light. provide exhaust fan and fluorescent light or o.s in bathroom, provide rated shaft enclosure if applicable. not window & stair work.Details
remodel 4 kitchens and 6 bathrooms for the building. non structural remodels. new lighting. 50% of kitchen light watts shall be of high efficacy light. provide exhaust fan and fluorescent light or o.s in bathroom, provide rated shaft enclosure if applicable. not window & stair work. | $55,000 |
| Oct 26, 2007 | Completed final sign-off Oct 2008 | 2518 31st Av | remodel kitchen. fill-in center patio. add bath & closet. new stairs to basement. new family room, bath & laundry downstairs. add deck less than 10'-0" high to rear. general mech, elec. & plumb upgrades as needed.Details
remodel kitchen. fill-in center patio. add bath & closet. new stairs to basement. new family room, bath & laundry downstairs. add deck less than 10'-0" high to rear. general mech, elec. & plumb upgrades as needed. | $58,520 |
| Jun 11, 2007 | Completed final sign-off Aug 2007 | 1663 11th Av | remodel existing kitchen. remove existing cabinets. upgrade electrical. install sheetrock, cabinets and plumbing fixture.Details
remodel existing kitchen. remove existing cabinets. upgrade electrical. install sheetrock, cabinets and plumbing fixture. | $8,500 |
| Mar 7, 2007 | Completed final sign-off Aug 2007 | 9 Tracy Pl | repair/restructure (e) porch top unit. remodel kitchen, bath and add bath. replace windows, one skylight also at top unit. remodel bath at bottom unit-remodel front doorway. general mechanical, electrical, plumbing upgrade as needed. add header beams where 2 walls are removed as needed at top unitDetails
repair/restructure (e) porch top unit. remodel kitchen, bath and add bath. replace windows, one skylight also at top unit. remodel bath at bottom unit-remodel front doorway. general mechanical, electrical, plumbing upgrade as needed. add header beams where 2 walls are removed as needed at top unit | $32,000 |
| Oct 10, 2006 | Completed final sign-off Mar 2007 | 207 Caselli Av | remodel of existingkitchen & bathroom. minor changes in finishes, plumbing & electrical service. no structural changes, bathrooms lighting to of florusent or on detector (e) kitchen lighting to remain. upgrade outlets in kitchen 4ft apartDetails
remodel of existingkitchen & bathroom. minor changes in finishes, plumbing & electrical service. no structural changes, bathrooms lighting to of florusent or on detector (e) kitchen lighting to remain. upgrade outlets in kitchen 4ft apart | $10,250 |
| Jul 11, 2006 | Completed final sign-off Sep 2006 | 1842 Stockton St | replace kitchen counters & cabinets, relocate kitchen.path door , neew location of wate heater, cover up pantry window. new vent duck to stove, minor new electrical work (*new gfi's etc.) minor wll patching no structural changes. (all noted on drawing. a-1.)Details
replace kitchen counters & cabinets, relocate kitchen.path door , neew location of wate heater, cover up pantry window. new vent duck to stove, minor new electrical work (*new gfi's etc.) minor wll patching no structural changes. (all noted on drawing. a-1.) | $10,000 |
| Sep 6, 2005 | Completed final sign-off Oct 2005 | 2231 Rivera St | remodel kitchen. put in new cabinet and countertop. new appliances. no structural work. provide flouDetails
remodel kitchen. put in new cabinet and countertop. new appliances. no structural work. provide flou | $10,000 |