Back to bathroom remodel contractors
K L Construction Inc./Pls Check Id./Note
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Aug 2013
- Last 24 months
- 0 permits filed
87 permits since 2000: 82 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 33 completed, 1 never finaled. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2013 | Completed final sign-off Jul 2013 | 136 Whitney St | remodel (e) kitchen - new cabinets, fixtures and appliances. remodel (e) bathroom - new fixtures and finishes.Details
remodel (e) kitchen - new cabinets, fixtures and appliances. remodel (e) bathroom - new fixtures and finishes. | $18,277 |
| Mar 22, 2013 | Completed final sign-off Oct 2013 | 726 23rd Av | remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flrDetails
remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flr | $15,000 |
| Jan 23, 2013 | Completed final sign-off May 2013 | 218 Molimo Dr | remodel kitchen & bathroom, cabinet, countertop, sink & appliances & light @ kitchen, tiles, tub, sink, toilet & light @ bathroom. replace one window in kind at the back of house.Details
remodel kitchen & bathroom, cabinet, countertop, sink & appliances & light @ kitchen, tiles, tub, sink, toilet & light @ bathroom. replace one window in kind at the back of house. | $16,000 |
| Dec 12, 2012 | Completed final sign-off Sep 2013 | 3101 Harrison St | remodel bathroom & laundry for the unit, lighting shall comply w/title 24.Details
remodel bathroom & laundry for the unit, lighting shall comply w/title 24. | $9,000 |
| Dec 3, 2012 | Completed final sign-off Sep 2013 | 3101 Harrison St | remodel 3 bathrooms @ #3101a, 3103, 3103a. repair some stucco, about 200 sq.ft. in front, install r-19 for ceiling.Details
remodel 3 bathrooms @ #3101a, 3103, 3103a. repair some stucco, about 200 sq.ft. in front, install r-19 for ceiling. | $25,000 |
| Jun 22, 2012 | Completed final sign-off Sep 2012 | 1386 40th Av | remodel gr floor. add bedroom, family room, full bath, and storage roomDetails
remodel gr floor. add bedroom, family room, full bath, and storage room | $40,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2012 | 2728 Irving St | remodel two bathrooms. one on the second floor. one on the third floor. existing walls to remain without modifications. lighting will comply w/cec 150(k). 10.Details
remodel two bathrooms. one on the second floor. one on the third floor. existing walls to remain without modifications. lighting will comply w/cec 150(k). 10. | $15,000 |
| Nov 14, 2011 | Completed final sign-off Apr 2012 | 3494 21st St | remodel 3 extg bathrooms. add door to garage at side from yard (not visible from street)repair extg rear stairs(not visible from street where work is done). general mep upgrades. add laundry room at kitchen. stair not a required exit.Details
remodel 3 extg bathrooms. add door to garage at side from yard (not visible from street)repair extg rear stairs(not visible from street where work is done). general mep upgrades. add laundry room at kitchen. stair not a required exit. | $35,301 |
| Jul 1, 2011 | Completed final sign-off Nov 2011 | 906 Vallejo St | remodel one kitchen, 2 bathrooms, kitchen provide min 50% of light watts in h.e. light. bath: h.e. or "manual on" occupancy sensor.Details
remodel one kitchen, 2 bathrooms, kitchen provide min 50% of light watts in h.e. light. bath: h.e. or "manual on" occupancy sensor. | $22,000 |
| Jan 31, 2011 | Completed final sign-off Sep 2011 | 1663 11th Av | remodel one bathroom at upstair, no structural work, no wall relocation. high efficacy lighting or occupancy sensor control.Details
remodel one bathroom at upstair, no structural work, no wall relocation. high efficacy lighting or occupancy sensor control. | $7,000 |
| Jan 6, 2011 | Completed final sign-off Apr 2012 | 479 21st Av | remodel ground floor. add 1/2 bathroom and relocate laundryDetails
remodel ground floor. add 1/2 bathroom and relocate laundry | $15,000 |
| Jun 22, 2010 | Completed final sign-off Dec 2010 | 355 Yerba Buena Av | remodel gr fl: add 1 bedroom, 1 bath. remodel bath and family room. remodel 2nd fl: kitchen and 2 bathsDetails
remodel gr fl: add 1 bedroom, 1 bath. remodel bath and family room. remodel 2nd fl: kitchen and 2 baths | $50,000 |
| Apr 20, 2010 | Completed final sign-off Aug 2010 | 1954 23rd Av | remodel gr floor. legalize playroom and bedroom. add full bath. no wet bar.Details
remodel gr floor. legalize playroom and bedroom. add full bath. no wet bar. | $20,000 |
| Apr 14, 2010 | Completed final sign-off Oct 2010 | 45 Parker Av | change some broken tile on 2nd floor bathroom & paint exterior wall. no change lighting.Details
change some broken tile on 2nd floor bathroom & paint exterior wall. no change lighting. | $2,000 |
| Mar 18, 2010 | Completed final sign-off Feb 2011 | 3025 Ulloa St | second floor. remodel 2nd floor bathroom & kitchen, add 1 full bathroom @ 2nd fl.Details
second floor. remodel 2nd floor bathroom & kitchen, add 1 full bathroom @ 2nd fl. | $20,000 |
| Mar 2, 2010 | Never finaled issued Mar 2010, no final | 39 Cervantes Bl | remodel 1-kitchen & 2-bathrooms, 1-laundry room.no structure work @ 3rd. flr. replace dryer connect to existing duct, lighting per cec 150 (k).Details
remodel 1-kitchen & 2-bathrooms, 1-laundry room.no structure work @ 3rd. flr. replace dryer connect to existing duct, lighting per cec 150 (k). | $15,000 |
| Nov 13, 2009 | Completed final sign-off Feb 2010 | 3421 Geary Bl | interior alteration at unit 4 at 3rd fl. remodel (e) kitchen and bathroom, convert (e) living rm into two bedrooms. replace (e) 30" x 30" skylight. add new half bath as per planDetails
interior alteration at unit 4 at 3rd fl. remodel (e) kitchen and bathroom, convert (e) living rm into two bedrooms. replace (e) 30" x 30" skylight. add new half bath as per plan | $16,000 |
| Oct 2, 2009 | Completed final sign-off Dec 2009 | 1240 Willard St | remodel one kitchen and 1 1/2 bathroom. no structural workDetails
remodel one kitchen and 1 1/2 bathroom. no structural work | $15,000 |
| Sep 29, 2009 | Completed final sign-off May 2010 | 1431 33rd Av | ground floor-infill room, add 2 bedrooms, 2 1/2 bathrooms, family room, laundry & storage room. 2nd floor-add 2 bathroom & remodel (e) bathroomDetails
ground floor-infill room, add 2 bedrooms, 2 1/2 bathrooms, family room, laundry & storage room. 2nd floor-add 2 bathroom & remodel (e) bathroom | $70,000 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 520 02nd Av | in response to notice of violation #200788916 to demolish (e) kitchen & bedrooms behind garages. legalize (e) ground flr. to have 1-bedroom, 1-full bathroom, 1-storage room, 1-family room & 2-car side by side parking in garage.Details
in response to notice of violation #200788916 to demolish (e) kitchen & bedrooms behind garages. legalize (e) ground flr. to have 1-bedroom, 1-full bathroom, 1-storage room, 1-family room & 2-car side by side parking in garage. | $15,000 |
| Apr 1, 2009 | Completed final sign-off Jul 2009 | 1842 Stockton St | work @ unit# 1842 only. remodel bathroom. upgrade plumbing & electrical for bathroom. tile. no structural change.Details
work @ unit# 1842 only. remodel bathroom. upgrade plumbing & electrical for bathroom. tile. no structural change. | $9,000 |
| Dec 4, 2008 | Completed final sign-off Feb 2009 | 249 Richland Av | relocation of toilet, sink, keep bathtub. upgrade electrical for the bathroom.Details
relocation of toilet, sink, keep bathtub. upgrade electrical for the bathroom. | $8,838 |
| Dec 4, 2008 | Completed final sign-off Apr 2009 | 1263 Noe St | remodel kitchen. instal elec & plumbing fixtures, cabinets. change sink for bathroom. change tile & faucet for bathtub. keep toilet and bathtub. no structural work.Details
remodel kitchen. instal elec & plumbing fixtures, cabinets. change sink for bathroom. change tile & faucet for bathtub. keep toilet and bathtub. no structural work. | $17,188 |
| Apr 28, 2008 | Completed final sign-off Jul 2008 | 3644 24th St | work @ unit# 3644 only. remodel kitchen. bathroom. laundry.Details
work @ unit# 3644 only. remodel kitchen. bathroom. laundry. | $20,000 |
| Mar 27, 2008 | Completed final sign-off Oct 2008 | 1105 Stanyan St | remodel 4 kitchens and 6 bathrooms for the building. non structural remodels. new lighting. 50% of kitchen light watts shall be of high efficacy light. provide exhaust fan and fluorescent light or o.s in bathroom, provide rated shaft enclosure if applicable. not window & stair work.Details
remodel 4 kitchens and 6 bathrooms for the building. non structural remodels. new lighting. 50% of kitchen light watts shall be of high efficacy light. provide exhaust fan and fluorescent light or o.s in bathroom, provide rated shaft enclosure if applicable. not window & stair work. | $55,000 |
| Feb 22, 2008 | Completed final sign-off Jul 2008 | 1646 23rd Av | construct one bed room, sitting area and one full bath room at ground floor within building envelope. no structural changes.Details
construct one bed room, sitting area and one full bath room at ground floor within building envelope. no structural changes. | $38,000 |
| Oct 26, 2007 | Completed final sign-off Oct 2008 | 2518 31st Av | remodel kitchen. fill-in center patio. add bath & closet. new stairs to basement. new family room, bath & laundry downstairs. add deck less than 10'-0" high to rear. general mech, elec. & plumb upgrades as needed.Details
remodel kitchen. fill-in center patio. add bath & closet. new stairs to basement. new family room, bath & laundry downstairs. add deck less than 10'-0" high to rear. general mech, elec. & plumb upgrades as needed. | $58,520 |
| Jul 19, 2007 | Completed final sign-off Aug 2007 | 205 Caselli Av | remodel bathroom for 205 caselli. change faucet, sink toilet, tile lights. no structural work, new lights to be fluorescant or unoccupant sensorDetails
remodel bathroom for 205 caselli. change faucet, sink toilet, tile lights. no structural work, new lights to be fluorescant or unoccupant sensor | $6,454 |
| Apr 13, 2007 | Completed final sign-off Sep 2007 | 883 27th Av | remodel ktichen, bathroom & add one bathroom @ 1/f. infill under one of bedroom and add one bedroom, family room, 2 bathroom, storage room, laundry room @ g/f.Details
remodel ktichen, bathroom & add one bathroom @ 1/f. infill under one of bedroom and add one bedroom, family room, 2 bathroom, storage room, laundry room @ g/f. | $78,000 |
| Mar 7, 2007 | Completed final sign-off Aug 2007 | 9 Tracy Pl | repair/restructure (e) porch top unit. remodel kitchen, bath and add bath. replace windows, one skylight also at top unit. remodel bath at bottom unit-remodel front doorway. general mechanical, electrical, plumbing upgrade as needed. add header beams where 2 walls are removed as needed at top unitDetails
repair/restructure (e) porch top unit. remodel kitchen, bath and add bath. replace windows, one skylight also at top unit. remodel bath at bottom unit-remodel front doorway. general mechanical, electrical, plumbing upgrade as needed. add header beams where 2 walls are removed as needed at top unit | $32,000 |
| Nov 7, 2006 | Completed final sign-off Jan 2007 | 1 Daniel Burnham Ct | bathroom faucet, sink, tile (remodel) (n) shower, reuse (e) toilet. (2) bath remodel. non structural work.Details
bathroom faucet, sink, tile (remodel) (n) shower, reuse (e) toilet. (2) bath remodel. non structural work. | $15,000 |
| Oct 10, 2006 | Completed final sign-off Mar 2007 | 207 Caselli Av | remodel of existingkitchen & bathroom. minor changes in finishes, plumbing & electrical service. no structural changes, bathrooms lighting to of florusent or on detector (e) kitchen lighting to remain. upgrade outlets in kitchen 4ft apartDetails
remodel of existingkitchen & bathroom. minor changes in finishes, plumbing & electrical service. no structural changes, bathrooms lighting to of florusent or on detector (e) kitchen lighting to remain. upgrade outlets in kitchen 4ft apart | $10,250 |
| Mar 3, 2006 | Completed final sign-off Apr 2006 | 1638 23rd Av | bathroom added in basement, 1st floor of sunset homeDetails
bathroom added in basement, 1st floor of sunset home | $9,000 |
| Nov 8, 2005 | Completed final sign-off Dec 2005 | 394 Hearst Av | remodel bath on 2nd flr. change fixtures,vanity, wall coverings. no change to partitions or windowsDetails
remodel bath on 2nd flr. change fixtures,vanity, wall coverings. no change to partitions or windows | $5,000 |