K & J General Construction
- Based in
- Los Angeles
- On San Francisco permits
- Aug 2025 to Aug 2026
- Last 24 months
- 9 permits filed
9 permits since 2000: 5 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 38 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 1725 16th Av | interior remodel, at 1st flr, remodel (e) floor space to (n)bedorooms, bathrooms, wetbar, and laundry at 2nd flr. remodel kitchen, bathroom and dining, new pantry, powder room, and bathroom, new inerior stair. ab112Details
interior remodel, at 1st flr, remodel (e) floor space to (n)bedorooms, bathrooms, wetbar, and laundry at 2nd flr. remodel kitchen, bathroom and dining, new pantry, powder room, and bathroom, new inerior stair. ab112 | $235,000 |
| Nov 12, 2025 | Completed final sign-off Nov 2025 | 2024 15th Av | existing front deck to be inspected: added to scope of work per inspector's request. new tile on front stairs like for likeDetails
existing front deck to be inspected: added to scope of work per inspector's request. new tile on front stairs like for like | |
| Nov 5, 2025 | Completed final sign-off Aug 2026 | 227 Athens St | interior, structural renovation to result in a sfr with 3.5 baths. no increase to area. (n) location of interior stair, insulation, windows.Details
interior, structural renovation to result in a sfr with 3.5 baths. no increase to area. (n) location of interior stair, insulation, windows. | $100,000 |