Back to bathroom remodel contractors
K & J General Construction
- Based in
- Los Angeles
- On San Francisco permits
- Aug 2025 to Aug 2026
- Last 24 months
- 9 permits filed
9 permits since 2000: 5 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 3 in progress. Typically 30 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 1725 16th Av | interior remodel, at 1st flr, remodel (e) floor space to (n)bedorooms, bathrooms, wetbar, and laundry at 2nd flr. remodel kitchen, bathroom and dining, new pantry, powder room, and bathroom, new inerior stair. ab112Details
interior remodel, at 1st flr, remodel (e) floor space to (n)bedorooms, bathrooms, wetbar, and laundry at 2nd flr. remodel kitchen, bathroom and dining, new pantry, powder room, and bathroom, new inerior stair. ab112 | $235,000 |
| May 15, 2026 | In progress issued Jun 2026 | 286 Crescent Av | residential remodel. add media & family room, bedroom and bath. and laundry. 2nd fl. (n) wet bar, remodel (e) kitchen, new powder room. 3rd floor remodel (e) bath & add (n) bath.Details
residential remodel. add media & family room, bedroom and bath. and laundry. 2nd fl. (n) wet bar, remodel (e) kitchen, new powder room. 3rd floor remodel (e) bath & add (n) bath. | $198,000 |
| Mar 31, 2026 | In progress issued Apr 2026 | 66 Theresa St | 1st flr: remodel (e) floor space to 1 master suite, media, wetbar and laundry. at 2nd flr: remodel (e) kitchen and dining and powder room. 3rd flr remodel (e) bathroom and add new bathroom.Details
1st flr: remodel (e) floor space to 1 master suite, media, wetbar and laundry. at 2nd flr: remodel (e) kitchen and dining and powder room. 3rd flr remodel (e) bathroom and add new bathroom. | $198,000 |
| Nov 5, 2025 | Completed final sign-off Aug 2026 | 227 Athens St | interior, structural renovation to result in a sfr with 3.5 baths. no increase to area. (n) location of interior stair, insulation, windows.Details
interior, structural renovation to result in a sfr with 3.5 baths. no increase to area. (n) location of interior stair, insulation, windows. | $100,000 |
| Sep 12, 2025 | Completed final sign-off Mar 2026 | 77 Ottawa Av | comply w/ nov # 202543191: revision to pa # 202508274010 - constrcut 1 bedroom, 1 full bath, powder room, media room, & install wetbar at 1/f. replace (e) sheetrock w. new & in-fill (e) light-well at 2/f.Details
comply w/ nov # 202543191: revision to pa # 202508274010 - constrcut 1 bedroom, 1 full bath, powder room, media room, & install wetbar at 1/f. replace (e) sheetrock w. new & in-fill (e) light-well at 2/f. | $245,000 |
| Aug 27, 2025 | Completed final sign-off Mar 2026 | 77 Ottawa Av | remodel kitchen and (2) bathroom in kind, no structural change.Details
remodel kitchen and (2) bathroom in kind, no structural change. | $75,000 |