Back to kitchen remodel contractors
K G Construction
- Based in
- Oakland
- On San Francisco permits
- Jun 2006 to Jul 2022
- Last 24 months
- 0 permits filed
21 permits since 2000: 16 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 4 completed, 3 never finaled. Typically 0 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2021 | Completed final sign-off Jul 2023 | 3937 17th St | interior remodel of 2nd floor kitchen and bathroom. new opening in load bearing wall. 2 windows and one door replaced at 2nd floor rear wall and one window replaced at 2nd floor rear wall & one window replaced at 2nd floor bath. tructural strenghthening at ground floor rear porch and less then 50%Details
interior remodel of 2nd floor kitchen and bathroom. new opening in load bearing wall. 2 windows and one door replaced at 2nd floor rear wall and one window replaced at 2nd floor rear wall & one window replaced at 2nd floor bath. tructural strenghthening at ground floor rear porch and less then 50% | $110,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 123 Central Av | renovate kitchen (10'x 12')Details
renovate kitchen (10'x 12') | $10,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 121 Central Av | renovate kitchen (10'x 12') & bathroom (5'x 8')Details
renovate kitchen (10'x 12') & bathroom (5'x 8') | $36,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 119 Central Av | renovate kitchen (10'x 12') & bathroom (5'x 8')Details
renovate kitchen (10'x 12') & bathroom (5'x 8') | $20,000 |
| May 8, 2018 | Completed final sign-off Jun 2018 | 529 Lakeview Av | to comply with nov #201712856 sheetrock remove and patching for new receptacles in kitchenDetails
to comply with nov #201712856 sheetrock remove and patching for new receptacles in kitchen | $1,000 |
| Apr 26, 2017 | Completed final sign-off Aug 2017 | 63 Rae Av | repair fire damage (no structural work): remove lath and plaster, insulate, sheetrock, renovate kitchen and bath in kind. replace f.a.u. (gradelev) work in level two (living leu) only plus or minus 1300 sq. ft. sheetrock nail spacing.Details
repair fire damage (no structural work): remove lath and plaster, insulate, sheetrock, renovate kitchen and bath in kind. replace f.a.u. (gradelev) work in level two (living leu) only plus or minus 1300 sq. ft. sheetrock nail spacing. | $25,000 |
| Apr 27, 2016 | Completed final sign-off Feb 2017 | 518 Chenery St | renovate to include relocate kitchen, add bath, relcoate front door.Details
renovate to include relocate kitchen, add bath, relcoate front door. | $30,000 |