Back to bathroom remodel contractors
K G Construction
- Based in
- Oakland
- On San Francisco permits
- Jun 2006 to Jul 2022
- Last 24 months
- 0 permits filed
21 permits since 2000: 16 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 3 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2021 | Completed final sign-off Jul 2023 | 3937 17th St | interior remodel of 2nd floor kitchen and bathroom. new opening in load bearing wall. 2 windows and one door replaced at 2nd floor rear wall and one window replaced at 2nd floor rear wall & one window replaced at 2nd floor bath. tructural strenghthening at ground floor rear porch and less then 50%Details
interior remodel of 2nd floor kitchen and bathroom. new opening in load bearing wall. 2 windows and one door replaced at 2nd floor rear wall and one window replaced at 2nd floor rear wall & one window replaced at 2nd floor bath. tructural strenghthening at ground floor rear porch and less then 50% | $110,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 121 Central Av | renovate kitchen (10'x 12') & bathroom (5'x 8')Details
renovate kitchen (10'x 12') & bathroom (5'x 8') | $36,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 119 Central Av | renovate kitchen (10'x 12') & bathroom (5'x 8')Details
renovate kitchen (10'x 12') & bathroom (5'x 8') | $20,000 |
| Apr 26, 2017 | Completed final sign-off Aug 2017 | 63 Rae Av | repair fire damage (no structural work): remove lath and plaster, insulate, sheetrock, renovate kitchen and bath in kind. replace f.a.u. (gradelev) work in level two (living leu) only plus or minus 1300 sq. ft. sheetrock nail spacing.Details
repair fire damage (no structural work): remove lath and plaster, insulate, sheetrock, renovate kitchen and bath in kind. replace f.a.u. (gradelev) work in level two (living leu) only plus or minus 1300 sq. ft. sheetrock nail spacing. | $25,000 |
| Apr 27, 2016 | Completed final sign-off Feb 2017 | 518 Chenery St | renovate to include relocate kitchen, add bath, relcoate front door.Details
renovate to include relocate kitchen, add bath, relcoate front door. | $30,000 |
| Jun 24, 2015 | Never finaled issued Jul 2015, no final | 219 Brannan St | #a- additional office & additional on bathroom with shower, g/f for gym use only, no exterior change.Details
#a- additional office & additional on bathroom with shower, g/f for gym use only, no exterior change. | $8,000 |
| Nov 16, 2006 | Expired or cancelled expired Feb 2008 | 153 Del Vale Av | rework interior stair, build out new bath and exercise room in garage are, new window in lower level bedroom, change out garage door.Details
rework interior stair, build out new bath and exercise room in garage are, new window in lower level bedroom, change out garage door. | $20,000 |