Back to kitchen remodel contractors
K G Company
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jan 2020
- Last 24 months
- 0 permits filed
29 permits since 2000: 24 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 never finaled. Typically 0 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2019 | Completed final sign-off Jul 2020 | 450 Waller St | kitchen and bath remodel changing cabinet and fixtures. add a new 2nd bathDetails
kitchen and bath remodel changing cabinet and fixtures. add a new 2nd bath | $40,000 |
| Jun 19, 2018 | Completed final sign-off Feb 2019 | 1000 Irving St | kitchen and bathroom remodel, replace fixtures, cabinets, tiles, counter-topDetails
kitchen and bathroom remodel, replace fixtures, cabinets, tiles, counter-top | $9,500 |
| Jan 18, 2018 | Completed final sign-off Jun 2018 | 452 Waller St | kitchen and bathroom remodeling. change light fixtures, sinks, cabinets, tu, countertop, stove, toilet. no structural work. no wall modificationDetails
kitchen and bathroom remodeling. change light fixtures, sinks, cabinets, tu, countertop, stove, toilet. no structural work. no wall modification | $5,500 |
| Mar 7, 2016 | Completed final sign-off Jun 2016 | 1049 Treat Av | replace kitchen cabinet & fixtures.Details
replace kitchen cabinet & fixtures. | $3,500 |
| Dec 30, 2013 | Never finaled issued Dec 2013, no final | 1030 Treat Av | kitchen and bathroom remodeling at unit 1030 convert extg kitchen into new bedroom, convert extg dining into new kitchen on 2nd floor, add one full bath, one master and one family on ground floor.Details
kitchen and bathroom remodeling at unit 1030 convert extg kitchen into new bedroom, convert extg dining into new kitchen on 2nd floor, add one full bath, one master and one family on ground floor. | $45,000 |
| Dec 27, 2013 | Never finaled issued Dec 2013, no final | 1032 Treat Av | kitchen & bathroom remodeling at unit 1032. convert (e) dining into (n) kitchen. add one full bath and one toilet.Details
kitchen & bathroom remodeling at unit 1032. convert (e) dining into (n) kitchen. add one full bath and one toilet. | $35,000 |