Back to bathroom remodel contractors
K G Company
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jan 2020
- Last 24 months
- 0 permits filed
29 permits since 2000: 24 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 11 completed, 3 never finaled. Typically 0 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 8, 2020 | Completed final sign-off Jul 2020 | 450 Waller St | revision to 201909091065. change location of proposed new bath, 5 new skylights, 2x4, 1 x2x replace rear windows kindDetails
revision to 201909091065. change location of proposed new bath, 5 new skylights, 2x4, 1 x2x replace rear windows kind | $7,500 |
| Dec 23, 2019 | Completed final sign-off Mar 2020 | 1422 38th Av | remodel (e) bathroom, enlarge closet in (e) bedroom, new metal ladder to roof (exterior)Details
remodel (e) bathroom, enlarge closet in (e) bedroom, new metal ladder to roof (exterior) | $17,000 |
| Sep 9, 2019 | Completed final sign-off Jul 2020 | 450 Waller St | kitchen and bath remodel changing cabinet and fixtures. add a new 2nd bathDetails
kitchen and bath remodel changing cabinet and fixtures. add a new 2nd bath | $40,000 |
| Dec 7, 2018 | Completed final sign-off Sep 2019 | 2006 18th Av | new family room, bathroom & laundry room at ground level, enlarge exterior light well at ground level, rear yard decrease size of (e) deck at rear yardDetails
new family room, bathroom & laundry room at ground level, enlarge exterior light well at ground level, rear yard decrease size of (e) deck at rear yard | $150,000 |
| Jun 19, 2018 | Completed final sign-off Feb 2019 | 1000 Irving St | kitchen and bathroom remodel, replace fixtures, cabinets, tiles, counter-topDetails
kitchen and bathroom remodel, replace fixtures, cabinets, tiles, counter-top | $9,500 |
| Mar 7, 2018 | Completed final sign-off Jun 2018 | 452 Waller St | revision to permit app# 201801188951 add a (n) bathroomDetails
revision to permit app# 201801188951 add a (n) bathroom | $5,000 |
| Jan 18, 2018 | Completed final sign-off Jun 2018 | 452 Waller St | kitchen and bathroom remodeling. change light fixtures, sinks, cabinets, tu, countertop, stove, toilet. no structural work. no wall modificationDetails
kitchen and bathroom remodeling. change light fixtures, sinks, cabinets, tu, countertop, stove, toilet. no structural work. no wall modification | $5,500 |
| Nov 13, 2017 | Completed final sign-off Mar 2019 | 317 Dellbrook Av | new deck. remodel garage floor with new office, family room & bathroom.Details
new deck. remodel garage floor with new office, family room & bathroom. | $125,000 |
| Jun 20, 2017 | Completed final sign-off Apr 2019 | 301 Chicago Wy | 1st fl: add 1 full bath, 2 storage rooms, 1 tool room, and exercise room.Details
1st fl: add 1 full bath, 2 storage rooms, 1 tool room, and exercise room. | $25,000 |
| Dec 15, 2014 | Completed final sign-off Mar 2015 | 755 Florida St | apt #7. replace fixtures in bathroom, cabinet & mirror & light.Details
apt #7. replace fixtures in bathroom, cabinet & mirror & light. | $1,500 |
| Dec 30, 2013 | Never finaled issued Dec 2013, no final | 1030 Treat Av | kitchen and bathroom remodeling at unit 1030 convert extg kitchen into new bedroom, convert extg dining into new kitchen on 2nd floor, add one full bath, one master and one family on ground floor.Details
kitchen and bathroom remodeling at unit 1030 convert extg kitchen into new bedroom, convert extg dining into new kitchen on 2nd floor, add one full bath, one master and one family on ground floor. | $45,000 |
| Dec 27, 2013 | Never finaled issued Dec 2013, no final | 1032 Treat Av | kitchen & bathroom remodeling at unit 1032. convert (e) dining into (n) kitchen. add one full bath and one toilet.Details
kitchen & bathroom remodeling at unit 1032. convert (e) dining into (n) kitchen. add one full bath and one toilet. | $35,000 |
| Jan 19, 2012 | Never finaled issued Oct 2012, no final | 385 Day St | enclose space under (e) structrue & reconfigure garage space for addit'n bedrooms & bath on g/f. new interior stair at the front. enlarge rear deck. remove stucco on front & reside & retri.Details
enclose space under (e) structrue & reconfigure garage space for addit'n bedrooms & bath on g/f. new interior stair at the front. enlarge rear deck. remove stucco on front & reside & retri. | $60,000 |
| Dec 24, 2010 | Completed final sign-off Nov 2011 | 322 Park St | revision to appl #200509062087 - enlarge bathroom (a2).Details
revision to appl #200509062087 - enlarge bathroom (a2). |