K F L Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to May 2026
- Last 24 months
- 6 permits filed
38 permits since 2000: 34 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 10 completed, 1 in progress, 1 never finaled. Typically 8 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2025 | In progress issued Dec 2025 | 516 39th Av | remodel (e) kitchen, bath rm. add one new full bathroom. replace (e) sheet rock with new. at 2nd fl. construct two bed rooms, two full bath rms, family room install new kitchennette at ground floor.(n)4 skylightsDetails
remodel (e) kitchen, bath rm. add one new full bathroom. replace (e) sheet rock with new. at 2nd fl. construct two bed rooms, two full bath rms, family room install new kitchennette at ground floor.(n)4 skylights | $305,134 |
| Oct 8, 2025 | Completed final sign-off Oct 2025 | 2803 Greenwich St | replace insulation at crawl space. replace doors, remove combustible storage. relocate electric heater. replace toilet and repair kitchen sink comply w/ complaint #202541393 work will be 2803 1/2 greenwich st.Details
replace insulation at crawl space. replace doors, remove combustible storage. relocate electric heater. replace toilet and repair kitchen sink comply w/ complaint #202541393 work will be 2803 1/2 greenwich st. | $2,000 |
| Dec 13, 2024 | Completed final sign-off Jul 2025 | 219 Ramsell St | 1/f:add 2-bedrooms, 2-full bathrooms, kitchenette 2-burners & entertainment room, install new ceiling mount furnace and relocate water heater in garage. relocate laundry unit. 2/f: add deck & stair at rear of property, reconfigure interior layout to accommodate 2-bedrooms, 2-full bath,an office,....Details
1/f:add 2-bedrooms, 2-full bathrooms, kitchenette 2-burners & entertainment room, install new ceiling mount furnace and relocate water heater in garage. relocate laundry unit. 2/f: add deck & stair at rear of property, reconfigure interior layout to accommodate 2-bedrooms, 2-full bath,an office,.... | $80,000 |
| Sep 24, 2024 | Completed final sign-off Feb 2025 | 2384 29th Av | renovation 1 kitchen & 1 bathroom in-kind, no wall moving.Details
renovation 1 kitchen & 1 bathroom in-kind, no wall moving. | $25,000 |
| Jul 28, 2021 | Completed final sign-off May 2022 | 2550 26th Av | rev to pa202104138457. add kitchenette, relocated washer/dryer at 1/f.Details
rev to pa202104138457. add kitchenette, relocated washer/dryer at 1/f. | $5,000 |
| Jun 3, 2019 | Completed final sign-off Aug 2020 | 306 Stratford Dr | add 2 bathrooms to 2nd flr, remove partition walls at dining area, kitchen remodelDetails
add 2 bathrooms to 2nd flr, remove partition walls at dining area, kitchen remodel | $35,000 |
| Apr 2, 2018 | Never finaled issued Apr 2018, no final | 1458 14th Av | unit #1: remodel kitchen and bathroom. install new cabinets, sink, faucet in kitchen. new sink, faucet, tub, and toilet in bathroomDetails
unit #1: remodel kitchen and bathroom. install new cabinets, sink, faucet in kitchen. new sink, faucet, tub, and toilet in bathroom | $20,000 |
| Nov 6, 2017 | Completed final sign-off May 2019 | 125 Wayland St | remodel (e) kitchen & bathroom, add one new full bathroom & convert shower room to toilet room at 2nd floor. construct two bedrooms, one full bathroom & family room @ ground floor. maher n/a.Details
remodel (e) kitchen & bathroom, add one new full bathroom & convert shower room to toilet room at 2nd floor. construct two bedrooms, one full bathroom & family room @ ground floor. maher n/a. | $68,000 |
| Jul 21, 2017 | Completed final sign-off Sep 2017 | 619 Shotwell St | kitchen and bathroom remodel in unit #5:change kitchen cabinets & countertop;change bathroom bath tub and replace tiles at walls & floor. no new wall & no (e)wall relocation. new fixtures to be remain at same location.new lighting in kitchen & bathroom remodel shall comply with cec 150.0(k)3 & (k)5Details
kitchen and bathroom remodel in unit #5:change kitchen cabinets & countertop;change bathroom bath tub and replace tiles at walls & floor. no new wall & no (e)wall relocation. new fixtures to be remain at same location.new lighting in kitchen & bathroom remodel shall comply with cec 150.0(k)3 & (k)5 | $5,000 |
| Apr 19, 2017 | Completed final sign-off Sep 2017 | 210 Drake St | kitchen remodel. change cabinets, sink and countertop. add ceiling lights. no walls to be removed or altered.Details
kitchen remodel. change cabinets, sink and countertop. add ceiling lights. no walls to be removed or altered. | $12,000 |
| Nov 17, 2016 | Completed final sign-off Jan 2019 | 166 Bridgeview Dr | remodel (e) kitchen & 2 (e) bathrooms. update electric plug, install 18 recessed lights, replace drywall, change 2 windows & sliding door @ rear.Details
remodel (e) kitchen & 2 (e) bathrooms. update electric plug, install 18 recessed lights, replace drywall, change 2 windows & sliding door @ rear. | $25,000 |
| Oct 26, 2016 | Completed final sign-off Mar 2017 | 300 Buchanan St | unit 310, 4th floor - relocate (e) kitchen, remodel (e) bathroom, convert (e) kitchen to bedroom, add washer & dryerDetails
unit 310, 4th floor - relocate (e) kitchen, remodel (e) bathroom, convert (e) kitchen to bedroom, add washer & dryer | $38,000 |