Jxyz Integrity Construction Co
- Based in
- San Leandro
- On San Francisco permits
- Mar 2017 to Feb 2020
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 95 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2017 | Expired or cancelled expired Oct 2019 | 707 Faxon Av | provide 3 new bedrooms, 2 bathrooms and laundry at ground floor. remodel (e) kitchen and bath on 2nd floor. provide new bath on 2nd floor; replace (e) interior stairs. replace (e) windows per plan, non visible from street. structural work included.Details
provide 3 new bedrooms, 2 bathrooms and laundry at ground floor. remodel (e) kitchen and bath on 2nd floor. provide new bath on 2nd floor; replace (e) interior stairs. replace (e) windows per plan, non visible from street. structural work included. | $80,000 |