Back to bathroom remodel contractors
Jxyz Integrity Construction Co
- Based in
- San Leandro
- On San Francisco permits
- Mar 2017 to Feb 2020
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 expired or cancelled. Typically 48 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2020 | Completed final sign-off Feb 2021 | 2379 39th Av | remodel existing ground fl. convert space to two bedrooms & two baths. rpelae 2nd fl 4 front windows with wood clad vinyl. rpelace 4 windows at lightwell with vinyl.Details
remodel existing ground fl. convert space to two bedrooms & two baths. rpelae 2nd fl 4 front windows with wood clad vinyl. rpelace 4 windows at lightwell with vinyl. | $80,000 |
| Jan 23, 2018 | Expired or cancelled expired Oct 2019 | 707 Faxon Av | revision to app#201703131305: 1) change kitchen and 3 bathrooms configurations based on an approved bldg permit. to include electrical and plumbing work. 2) relocate water heater & furnace per plan. 3)change electric fire place with gas type fire place. n/a for maherDetails
revision to app#201703131305: 1) change kitchen and 3 bathrooms configurations based on an approved bldg permit. to include electrical and plumbing work. 2) relocate water heater & furnace per plan. 3)change electric fire place with gas type fire place. n/a for maher | $4,500 |
| Jul 11, 2017 | Completed final sign-off Dec 2017 | 1391 23rd Av | construct two bedrooms & two half bathrooms. all work at ground floor.Details
construct two bedrooms & two half bathrooms. all work at ground floor. | $48,000 |
| Mar 13, 2017 | Expired or cancelled expired Oct 2019 | 707 Faxon Av | provide 3 new bedrooms, 2 bathrooms and laundry at ground floor. remodel (e) kitchen and bath on 2nd floor. provide new bath on 2nd floor; replace (e) interior stairs. replace (e) windows per plan, non visible from street. structural work included.Details
provide 3 new bedrooms, 2 bathrooms and laundry at ground floor. remodel (e) kitchen and bath on 2nd floor. provide new bath on 2nd floor; replace (e) interior stairs. replace (e) windows per plan, non visible from street. structural work included. | $80,000 |