Back to kitchen remodel contractors
Jungsten Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 1 permit filed
43 permits since 2000: 35 completed, 1 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2022 | Completed final sign-off Oct 2024 | 2741 Divisadero St | interior remodel - move kitchen, new bathroom and structural uprgradesDetails
interior remodel - move kitchen, new bathroom and structural uprgrades | $1,500,000 |
| Jan 19, 2017 | Completed final sign-off Feb 2017 | 130 Lippard Av | revision to app#201312063515:reframe kitchen walls (dificient extg framing), revision to foundation and shear wall. no change to original scope.Details
revision to app#201312063515:reframe kitchen walls (dificient extg framing), revision to foundation and shear wall. no change to original scope. | $10,000 |
| Jun 5, 2015 | Completed final sign-off Oct 2015 | 298 Upper Tr | revision to pa#2015-0226-9431. interior kitchen & bathroom remodel; non-structural revisions.Details
revision to pa#2015-0226-9431. interior kitchen & bathroom remodel; non-structural revisions. | $30,000 |
| Dec 17, 2013 | Completed final sign-off Jun 2014 | 264 Precita Av | re-construct entry stairs in kind. replace kitchen nook door & window with new "nanawall" unit.Details
re-construct entry stairs in kind. replace kitchen nook door & window with new "nanawall" unit. | $27,000 |
| Nov 10, 2011 | Never finaled issued Mar 2012, no final | 110 Freelon St | interior renovation of existing loft, move baths, kitchen remodel, interior froming, replace skylights, reinforce structure and new skylight installed, in soma with reduced floor area and sprinkled throughout. page a-2.00 item 4 unvented ethanol fireplace not permitted.Details
interior renovation of existing loft, move baths, kitchen remodel, interior froming, replace skylights, reinforce structure and new skylight installed, in soma with reduced floor area and sprinkled throughout. page a-2.00 item 4 unvented ethanol fireplace not permitted. | $800,000 |
| Jan 13, 2010 | Completed final sign-off May 2010 | 1800 Gough St | remodel kitchen, replace cabients & counters, new appliances, new lighting, same footprint, same plumbing locations.no door work, no window work on this permit. no structural changes. at least 50% high efficacy wattage.Details
remodel kitchen, replace cabients & counters, new appliances, new lighting, same footprint, same plumbing locations.no door work, no window work on this permit. no structural changes. at least 50% high efficacy wattage. | $52,000 |
| Sep 9, 2008 | Completed final sign-off Mar 2009 | 1000 Franklin St | interior work only. new cabinets in kitchen , master bath, new lighting & electrical/plmg. relocated non structural wall at master bath areaDetails
interior work only. new cabinets in kitchen , master bath, new lighting & electrical/plmg. relocated non structural wall at master bath area | $80,000 |
| Sep 12, 2002 | Expired or cancelled expired Dec 2003 | 2957 Washington St | refacing of kitchen & bathroom for top floor unit. structural changesDetails
refacing of kitchen & bathroom for top floor unit. structural changes | $80,000 |