Back to bathroom remodel contractors
Jungsten Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 1 permit filed
43 permits since 2000: 35 completed, 1 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2022 | Completed final sign-off Oct 2024 | 2741 Divisadero St | interior remodel - move kitchen, new bathroom and structural uprgradesDetails
interior remodel - move kitchen, new bathroom and structural uprgrades | $1,500,000 |
| Jun 5, 2015 | Completed final sign-off Oct 2015 | 298 Upper Tr | revision to pa#2015-0226-9431. interior kitchen & bathroom remodel; non-structural revisions.Details
revision to pa#2015-0226-9431. interior kitchen & bathroom remodel; non-structural revisions. | $30,000 |
| Apr 7, 2015 | Completed final sign-off May 2016 | 4349 18th St | revision to pa #201406249251 - revise interior partition plans, minor structural modifications, change storage to powder rm @ 2nd flr. reconfigure floor layout & add 2 baths @ 3rd & 4th floor. add sidewall windows at (e) openings, new hvac & electrical.Details
revision to pa #201406249251 - revise interior partition plans, minor structural modifications, change storage to powder rm @ 2nd flr. reconfigure floor layout & add 2 baths @ 3rd & 4th floor. add sidewall windows at (e) openings, new hvac & electrical. | $100,000 |
| Feb 20, 2014 | Completed final sign-off Sep 2014 | 1333 Jones St | #1208 - interior remodel of existing master bath with new finishes. replacement of fixtures and finishes in hall bath. replace existing light fixtures. replace outlets with code compliant gfci outlets. all work is non structuralDetails
#1208 - interior remodel of existing master bath with new finishes. replacement of fixtures and finishes in hall bath. replace existing light fixtures. replace outlets with code compliant gfci outlets. all work is non structural | $225,000 |
| Nov 10, 2011 | Never finaled issued Mar 2012, no final | 110 Freelon St | interior renovation of existing loft, move baths, kitchen remodel, interior froming, replace skylights, reinforce structure and new skylight installed, in soma with reduced floor area and sprinkled throughout. page a-2.00 item 4 unvented ethanol fireplace not permitted.Details
interior renovation of existing loft, move baths, kitchen remodel, interior froming, replace skylights, reinforce structure and new skylight installed, in soma with reduced floor area and sprinkled throughout. page a-2.00 item 4 unvented ethanol fireplace not permitted. | $800,000 |
| Nov 5, 2010 | Completed final sign-off Mar 2011 | 3003 Jackson St | master bath remodel @ top floor as per plan, inspect & replace dryrot @ top floor & family room decks, repair molding & doors @ top floor guest bedrooms.Details
master bath remodel @ top floor as per plan, inspect & replace dryrot @ top floor & family room decks, repair molding & doors @ top floor guest bedrooms. | $42,500 |
| Oct 19, 2009 | Completed final sign-off Jan 2010 | 2736 Filbert St | revision-addition to existing permit #2009/0819/5118. relocate doorway on 1st. flr. (ues) existing door for new closet, non-structrural. enlarge closet on 3rd. flr. non-structural.legalize bath on ground floor.Details
revision-addition to existing permit #2009/0819/5118. relocate doorway on 1st. flr. (ues) existing door for new closet, non-structrural. enlarge closet on 3rd. flr. non-structural.legalize bath on ground floor. | $1,000 |
| Aug 19, 2009 | Completed final sign-off Jan 2010 | 2736 Filbert St | replace in kind - 9 single pane french doors, 4 single pane windows, 1 door with double pane insulated in same openings with clad wood. bathroom remodel, no structural work u-factor <0.67 typical.Details
replace in kind - 9 single pane french doors, 4 single pane windows, 1 door with double pane insulated in same openings with clad wood. bathroom remodel, no structural work u-factor <0.67 typical. | $50,000 |
| Sep 9, 2008 | Completed final sign-off Mar 2009 | 1000 Franklin St | interior work only. new cabinets in kitchen , master bath, new lighting & electrical/plmg. relocated non structural wall at master bath areaDetails
interior work only. new cabinets in kitchen , master bath, new lighting & electrical/plmg. relocated non structural wall at master bath area | $80,000 |
| Mar 12, 2007 | Completed final sign-off Oct 2007 | 2127 Broadway | interior remodel of extg kchn and bathrooms (3) at 2nd floor at unit #2Details
interior remodel of extg kchn and bathrooms (3) at 2nd floor at unit #2 | $190,000 |
| Feb 26, 2004 | Completed final sign-off Jun 2004 | 2961 Washington St | refacing of 2-bathrooms, one-1 toilet rm.Details
refacing of 2-bathrooms, one-1 toilet rm. | $7,500 |
| Sep 12, 2002 | Expired or cancelled expired Dec 2003 | 2957 Washington St | refacing of kitchen & bathroom for top floor unit. structural changesDetails
refacing of kitchen & bathroom for top floor unit. structural changes | $80,000 |