Junda Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Apr 2026
- Last 24 months
- 3 permits filed
18 permits since 2000: 17 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 in progress. Typically 13 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2026 | In progress issued May 2026 | 1962 47th Av | 1/f: add home office, family room with wet bar, new bedroom and bathroom. remodel (e) bedroom and bathroom. relocate laundry. 2/f: total remodel. reconfigure (e) kitchen, bedrooms and bathrooms. reconfigure interior stair.Details
1/f: add home office, family room with wet bar, new bedroom and bathroom. remodel (e) bedroom and bathroom. relocate laundry. 2/f: total remodel. reconfigure (e) kitchen, bedrooms and bathrooms. reconfigure interior stair. | $200,000 |
| Aug 20, 2025 | Completed final sign-off Mar 2026 | 554 18th Av | replace front stairs and enlarge garage size to 8'6"Details
replace front stairs and enlarge garage size to 8'6" | $5,000 |
| Jun 12, 2025 | Completed final sign-off Mar 2026 | 554 18th Av | revision to pa# 202403278745: 1/f-reconfigure wetbar and laundry. relocate under stairs closet to common area. 2/f- remove bar cabinet at dining rm. add partial wall at stair landing. 3/f-add 1 skylight w/ 1 hr fire rated parapet, 1 new furnace, add 1 door to bathroom, and remove vanity from masterDetails
revision to pa# 202403278745: 1/f-reconfigure wetbar and laundry. relocate under stairs closet to common area. 2/f- remove bar cabinet at dining rm. add partial wall at stair landing. 3/f-add 1 skylight w/ 1 hr fire rated parapet, 1 new furnace, add 1 door to bathroom, and remove vanity from master | $500 |
| Apr 22, 2024 | Completed final sign-off Mar 2026 | 554 18th Av | 3 story horizontal addition - 1st fl - add 2 bedrooms, 1 full bath, and media room; 2nd fl - remodel, kitchen & bath; add deck @ rear; 3rd fl l- remodel bath, and add 1 full bath; reconfigure interior stairsDetails
3 story horizontal addition - 1st fl - add 2 bedrooms, 1 full bath, and media room; 2nd fl - remodel, kitchen & bath; add deck @ rear; 3rd fl l- remodel bath, and add 1 full bath; reconfigure interior stairs | $500,000 |
| Jul 6, 2022 | Completed final sign-off Jun 2024 | 358 Hearst Av | 2/f: remodel kitchen, bathroom, and add powder room. 3/f: remodel kitchen, bathroom, and add powder room and office. reconfigure interior stairs and exterior front stairs. replace new stucco at the front of the building.Details
2/f: remodel kitchen, bathroom, and add powder room. 3/f: remodel kitchen, bathroom, and add powder room and office. reconfigure interior stairs and exterior front stairs. replace new stucco at the front of the building. | $95,000 |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 76 Springfield Dr | revision to bpa#202008252566: 1/f: add (1) bedroom, (1) full bath & play room; 2/f: remodel kitchen, bedrooms & bathrooms, replace front windows w/in-kind. relocate interior stair case. windows at front to be wood interior with aluminum cladding.Details
revision to bpa#202008252566: 1/f: add (1) bedroom, (1) full bath & play room; 2/f: remodel kitchen, bedrooms & bathrooms, replace front windows w/in-kind. relocate interior stair case. windows at front to be wood interior with aluminum cladding. | $50,000 |