Junda Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Apr 2026
- Last 24 months
- 3 permits filed
18 permits since 2000: 17 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 in progress. Typically 18 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2026 | In progress issued May 2026 | 1962 47th Av | 1/f: add home office, family room with wet bar, new bedroom and bathroom. remodel (e) bedroom and bathroom. relocate laundry. 2/f: total remodel. reconfigure (e) kitchen, bedrooms and bathrooms. reconfigure interior stair.Details
1/f: add home office, family room with wet bar, new bedroom and bathroom. remodel (e) bedroom and bathroom. relocate laundry. 2/f: total remodel. reconfigure (e) kitchen, bedrooms and bathrooms. reconfigure interior stair. | $200,000 |
| Oct 4, 2024 | Completed final sign-off Feb 2025 | 2730 Santiago St | 1st flr: add family room with wet bar. 1 bedroom and 1 full bath. 2nd flr: kitchen remodel in kind.Details
1st flr: add family room with wet bar. 1 bedroom and 1 full bath. 2nd flr: kitchen remodel in kind. | $75,000 |
| Apr 22, 2024 | Completed final sign-off Mar 2026 | 554 18th Av | 3 story horizontal addition - 1st fl - add 2 bedrooms, 1 full bath, and media room; 2nd fl - remodel, kitchen & bath; add deck @ rear; 3rd fl l- remodel bath, and add 1 full bath; reconfigure interior stairsDetails
3 story horizontal addition - 1st fl - add 2 bedrooms, 1 full bath, and media room; 2nd fl - remodel, kitchen & bath; add deck @ rear; 3rd fl l- remodel bath, and add 1 full bath; reconfigure interior stairs | $500,000 |
| Oct 11, 2022 | Completed final sign-off Nov 2023 | 1218 18th Av | 1st fl: add utility room. 2nd fl: remodel kitchen, bathroom, add 1 full bath & 1 bedroom. 3rd fl: remodel kitchen, bathroom, add 1 full bath & 1 bedroom.cDetails
1st fl: add utility room. 2nd fl: remodel kitchen, bathroom, add 1 full bath & 1 bedroom. 3rd fl: remodel kitchen, bathroom, add 1 full bath & 1 bedroom.c | $95,000 |
| Jul 6, 2022 | Completed final sign-off Jun 2024 | 358 Hearst Av | 2/f: remodel kitchen, bathroom, and add powder room. 3/f: remodel kitchen, bathroom, and add powder room and office. reconfigure interior stairs and exterior front stairs. replace new stucco at the front of the building.Details
2/f: remodel kitchen, bathroom, and add powder room. 3/f: remodel kitchen, bathroom, and add powder room and office. reconfigure interior stairs and exterior front stairs. replace new stucco at the front of the building. | $95,000 |
| Apr 8, 2021 | Completed final sign-off Nov 2021 | 2219 39th Av | 1st fl: add 1 bedroom. 2nd fl: remodel kitchen, bathroom and bedrooms. add 1 full bath. add new deck.Details
1st fl: add 1 bedroom. 2nd fl: remodel kitchen, bathroom and bedrooms. add 1 full bath. add new deck. | $45,000 |
| Mar 31, 2021 | Completed final sign-off Nov 2021 | 2219 39th Av | remodel kitchen (74 sf) 2 baths (73 sf). replce insulatin and sheetrock throughout ceiling and walls. nailing to be 100 on center, edge nailing 100 @ 12" oc filed. the replacement must be 5/8" ype x with 5d coder nails @ 4" on center or equivalent screws. approx 1500sf. no wall modification. noDetails
remodel kitchen (74 sf) 2 baths (73 sf). replce insulatin and sheetrock throughout ceiling and walls. nailing to be 100 on center, edge nailing 100 @ 12" oc filed. the replacement must be 5/8" ype x with 5d coder nails @ 4" on center or equivalent screws. approx 1500sf. no wall modification. no | $30,000 |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 76 Springfield Dr | revision to bpa#202008252566: 1/f: add (1) bedroom, (1) full bath & play room; 2/f: remodel kitchen, bedrooms & bathrooms, replace front windows w/in-kind. relocate interior stair case. windows at front to be wood interior with aluminum cladding.Details
revision to bpa#202008252566: 1/f: add (1) bedroom, (1) full bath & play room; 2/f: remodel kitchen, bedrooms & bathrooms, replace front windows w/in-kind. relocate interior stair case. windows at front to be wood interior with aluminum cladding. | $50,000 |
| Aug 25, 2020 | Completed final sign-off Apr 2021 | 76 Springfield Dr | remodel kitchen 137 sq ft and 2 baths 88 sq ft. replace sheetrockDetails
remodel kitchen 137 sq ft and 2 baths 88 sq ft. replace sheetrock | $32,000 |