Back to kitchen remodel contractors
Jta Construction Inc.
- Based in
- Hickman
- On San Francisco permits
- Dec 2020 to Sep 2023
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 30 days from filing to permit and 768 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2020 | Completed final sign-off Feb 2023 | 222 Cherry St | 3rd floor unit #222: remodel (e) kitchen. remove non bearing wall between dining room and kitchen. install new light fixtures.Details
3rd floor unit #222: remodel (e) kitchen. remove non bearing wall between dining room and kitchen. install new light fixtures. | $9,000 |