Back to bathroom remodel contractors
Jta Construction Inc.
- Based in
- Hickman
- On San Francisco permits
- Dec 2020 to Sep 2023
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 2 never finaled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2023 | Completed final sign-off May 2024 | 10 Miller Pl | unit #602: bathroom remodel with shower stall, fixtures, & finishes to be replaced in kind. no structural changes.Details
unit #602: bathroom remodel with shower stall, fixtures, & finishes to be replaced in kind. no structural changes. | $21,000 |
| Sep 18, 2023 | Completed final sign-off Nov 2023 | 826 Moultrie St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $20,000 |
| Jul 18, 2023 | Completed final sign-off Dec 2023 | 835 14th St | main bathroom remodel (50 sq t) change layout from tub to walk in curbless shower wall mounted double sink vanity add exhaust fan,fixtures to be replacced in kindDetails
main bathroom remodel (50 sq t) change layout from tub to walk in curbless shower wall mounted double sink vanity add exhaust fan,fixtures to be replacced in kind | $23,000 |
| Jun 27, 2023 | Completed final sign-off Nov 2023 | 834 Moultrie St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $19,000 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 207 Randall St | rev to pa# 2023-0419-6027: to remodel (e) bathroom upper level add one sink fixtureDetails
rev to pa# 2023-0419-6027: to remodel (e) bathroom upper level add one sink fixture | |
| Aug 2, 2022 | Completed final sign-off Jan 2023 | 1450 Phelps St | two bathroom remodels in-kind. no structural. no changes to walls. bath a) 44 sqft 3/4 bath on 2nd floor, replace existing with (n) curbed shower, toilet/bidet & vanity. bath b) 47 sqft full bath on ground floor. replace existing with (n) tub/shower, toilet and vanity. all (n) fixtures and finishes.Details
two bathroom remodels in-kind. no structural. no changes to walls. bath a) 44 sqft 3/4 bath on 2nd floor, replace existing with (n) curbed shower, toilet/bidet & vanity. bath b) 47 sqft full bath on ground floor. replace existing with (n) tub/shower, toilet and vanity. all (n) fixtures and finishes. | $29,000 |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 850 Powell St | one 100 sqft master bathroom remodel on 6th floor- replace existing with (n) toilet, vanity, all (n) fixtures and finishes curbed shower and soaking tub no structural. no changes to walls or openings.Details
one 100 sqft master bathroom remodel on 6th floor- replace existing with (n) toilet, vanity, all (n) fixtures and finishes curbed shower and soaking tub no structural. no changes to walls or openings. | $15,000 |
| Mar 4, 2022 | Never finaled issued Mar 2022, no final | 850 Powell St | unit #603. one 28 sqft bathroom remodel in-kind. no structural, no changes to walls or openings. replace existing with (n) toilet & vanity. all (n) fixtures & finishes.Details
unit #603. one 28 sqft bathroom remodel in-kind. no structural, no changes to walls or openings. replace existing with (n) toilet & vanity. all (n) fixtures & finishes. | $14,000 |