Back to kitchen remodel contractors
Joseph D. Devito Construction
- Based in
- Walnut Creek
- On San Francisco permits
- May 2011 to Apr 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2016 | Completed final sign-off Jan 2017 | 1254 20th Av | demo kitchen cabinets, open to studs upgrade electrical to code, insulate walls, ceiling 5/8 sjeetrpcl tape texture prime paint, install new cabinet, hood, counter tops, sink ,dishwasher, faucet garbage disposal, no soft addition.Details
demo kitchen cabinets, open to studs upgrade electrical to code, insulate walls, ceiling 5/8 sjeetrpcl tape texture prime paint, install new cabinet, hood, counter tops, sink ,dishwasher, faucet garbage disposal, no soft addition. | $25,000 |