Back to bathroom remodel contractors
Joseph D. Devito Construction
- Based in
- Walnut Creek
- On San Francisco permits
- May 2011 to Apr 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 3 days from filing to permit and 269 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2018 | Completed final sign-off Jan 2019 | 146 San Pablo Av | interior remodel of two bathrooms, including plumbing, electrical, minor framing & finishes. no structural work & no new floor areaDetails
interior remodel of two bathrooms, including plumbing, electrical, minor framing & finishes. no structural work & no new floor area | $71,500 |
| May 10, 2011 | Expired or cancelled expired Jul 2012 | 1242 Jackson St | new owner's remove existing cabinet sink, repair walls, new circuit if needed for mircowave, move water hot & cold, 24" drain also, gfi existing, add 2 plugs. remove walls & tile floor at bath new shower, tub valve, tub to remain, existing gfi in bath.Details
new owner's remove existing cabinet sink, repair walls, new circuit if needed for mircowave, move water hot & cold, 24" drain also, gfi existing, add 2 plugs. remove walls & tile floor at bath new shower, tub valve, tub to remain, existing gfi in bath. | $15,000 |