Back to kitchen remodel contractors
Jose Viera
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Mar 2025
- Last 24 months
- 1 permit filed
28 permits since 2000: 18 completed, 1 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 expired or cancelled. Typically 62 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2020 | Completed final sign-off Jun 2021 | 1859 Pine St | voluntary emergency foundation repair, new kitchen remodel, nw bath remodel,nw hardwood floors, nw front wood windows to match extg, all wood d.h. windows, plmg, & elec under seperate permit.Details
voluntary emergency foundation repair, new kitchen remodel, nw bath remodel,nw hardwood floors, nw front wood windows to match extg, all wood d.h. windows, plmg, & elec under seperate permit. | $190,000 |
| Jun 3, 2020 | Completed final sign-off Sep 2020 | 136 Ripley St | remodel of kitchen in kind, new cabinets , new lighting, new plumbing fixtures, new flooring , new door, drywall and painting.Details
remodel of kitchen in kind, new cabinets , new lighting, new plumbing fixtures, new flooring , new door, drywall and painting. | $25,000 |
| Dec 24, 2019 | Expired or cancelled cancelled Jan 2026 | 2325 03rd St | unit #410: remove old break room kitchen and install new kitchen with new cabinets, dishwasher, sink and shelves.Details
unit #410: remove old break room kitchen and install new kitchen with new cabinets, dishwasher, sink and shelves. | $25,000 |