Jose Olmos Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Nov 2013
- Last 24 months
- 0 permits filed
20 permits since 2000: 19 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 0 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2011 | Completed final sign-off Jul 2011 | 4652 18th St | front stairs. repair damage replace balusters in kind, less than 50% repairDetails
front stairs. repair damage replace balusters in kind, less than 50% repair | $3,600 |
| May 9, 2011 | Completed final sign-off Jul 2011 | 4656 18th St | front stairs, fix damage, replace balusters in kind. less than 50% repairDetails
front stairs, fix damage, replace balusters in kind. less than 50% repair | $3,150 |
| Jan 25, 2011 | Completed final sign-off Mar 2011 | 538 Munich St | repair dry rot damage to front stairway and landing. (limited to not more than 50% replacement of the structural).Details
repair dry rot damage to front stairway and landing. (limited to not more than 50% replacement of the structural). | $7,200 |
| Aug 17, 2010 | Completed final sign-off Jul 2011 | 208 Chenery St | add 2 new bedrooms, remodel e bathroom and e playroom on 1st floor and connect with 2nd fl with new stairDetails
add 2 new bedrooms, remodel e bathroom and e playroom on 1st floor and connect with 2nd fl with new stair | $110,000 |
| Oct 23, 2003 | Completed final sign-off May 2004 | 506 Rockdale Dr | items 4a &6a only of termite report#36875. 4a repair dry rot damage to front stairs, abotment 6a-repDetails
items 4a &6a only of termite report#36875. 4a repair dry rot damage to front stairs, abotment 6a-rep | $8,470 |