Back to bathroom remodel contractors
Jose Olmos Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Nov 2013
- Last 24 months
- 0 permits filed
20 permits since 2000: 19 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2013 | Completed final sign-off Jan 2014 | 570 Roosevelt Wy | repair bathrooms: leaking toilet cause damage in 2 bathroom, insurance open walls and floor to dry. repair damage, install 2 shower pan, change 1 bath tub, cover walls, install new tile in kind. no change on electrical.Details
repair bathrooms: leaking toilet cause damage in 2 bathroom, insurance open walls and floor to dry. repair damage, install 2 shower pan, change 1 bath tub, cover walls, install new tile in kind. no change on electrical. | $21,000 |
| Aug 17, 2010 | Completed final sign-off Jul 2011 | 208 Chenery St | add 2 new bedrooms, remodel e bathroom and e playroom on 1st floor and connect with 2nd fl with new stairDetails
add 2 new bedrooms, remodel e bathroom and e playroom on 1st floor and connect with 2nd fl with new stair | $110,000 |
| May 13, 2009 | Completed final sign-off Jul 2009 | 40 Hartford St | wokk @ unit# 42 only. remodel existing bathroom on the 2nd floor. no structural change. new fixture. toilet, floor. dry wall., lighting, shower.Details
wokk @ unit# 42 only. remodel existing bathroom on the 2nd floor. no structural change. new fixture. toilet, floor. dry wall., lighting, shower. | $12,000 |
| Jan 23, 2004 | Completed final sign-off Nov 2004 | 1919 Sacramento St | remodel existing bathrooms as per plans provided. no structural work. minor interior remodel.Details
remodel existing bathrooms as per plans provided. no structural work. minor interior remodel. | $62,000 |