Back to kitchen remodel contractors
Jones Bros Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to May 2016
- Last 24 months
- 0 permits filed
84 permits since 2000: 77 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
29 kitchen remodel permits: 26 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2016 | Completed final sign-off Jun 2016 | 1509 Golden Gate Av | remodel existing kitchen & bath. legalize of electrical for kitchen & bathroom.Details
remodel existing kitchen & bath. legalize of electrical for kitchen & bathroom. | $15,000 |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 2343 21st Av | remodel (e) one kitchen & one bathroom in upstairs. non structural.Details
remodel (e) one kitchen & one bathroom in upstairs. non structural. | $20,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2016 | 55 Park St | unit #205: remodel existing kitchen and bathroom. updgrade electrical to kitchen and bathroom to code.Details
unit #205: remodel existing kitchen and bathroom. updgrade electrical to kitchen and bathroom to code. | $15,000 |
| Nov 2, 2015 | Completed final sign-off Dec 2015 | 2008 Mcallister St | remodel existing kitchen - no walls moved, removed added or infilled. all existing layouts to remain unchanged.Details
remodel existing kitchen - no walls moved, removed added or infilled. all existing layouts to remain unchanged. | $12,000 |
| Oct 26, 2015 | Completed final sign-off Dec 2015 | 105 Lake St | unit #10 - kitchen & bathroom remodel - install subpanel for the unit; upgrade elec. for kit. & bath.Details
unit #10 - kitchen & bathroom remodel - install subpanel for the unit; upgrade elec. for kit. & bath. | $18,000 |
| Oct 23, 2015 | Completed final sign-off Dec 2015 | 26 Dorado Tr | unit b: remodel existing kitchen & bathroom.Details
unit b: remodel existing kitchen & bathroom. | $12,000 |
| Jul 7, 2015 | Completed final sign-off Aug 2015 | 1359 Sacramento St | unit #c3: remodel (e) kitchen, upgrade electrical for kitchen, replace total 3 windows (not facing to street), vinyl windows, u-factor shall not exceed .32Details
unit #c3: remodel (e) kitchen, upgrade electrical for kitchen, replace total 3 windows (not facing to street), vinyl windows, u-factor shall not exceed .32 | $8,000 |
| Jul 1, 2015 | Completed final sign-off Aug 2015 | 105 Lake St | unit 1: remodel (e) kitchen.install subpanenl and upgrade electrivcal for kitchen. replace total (4) windows (not faceing to street).Details
unit 1: remodel (e) kitchen.install subpanenl and upgrade electrivcal for kitchen. replace total (4) windows (not faceing to street). | $10,000 |
| Jun 10, 2015 | Completed final sign-off Jul 2015 | 441 24th Av | remodel existing kitchen. upgrade electric for kitchen and subpanel in kitchen area. now alls to be alteredDetails
remodel existing kitchen. upgrade electric for kitchen and subpanel in kitchen area. now alls to be altered | $5,000 |
| Apr 27, 2015 | Completed final sign-off Jun 2015 | 1359 Sacramento St | unit # c4: remodel (e) kitchen & bathrom. upgrade electrical. replace 2 windows like for lile- not visible fromt he street. no walls moved, removed or added. all layout unchanged.Details
unit # c4: remodel (e) kitchen & bathrom. upgrade electrical. replace 2 windows like for lile- not visible fromt he street. no walls moved, removed or added. all layout unchanged. | $18,000 |
| Mar 30, 2015 | Completed final sign-off Jun 2015 | 441 24th Av | #10- remodel existing kitchen & bathroom including update electrical to bldg. code for kitchen & bathroom, replace 3 windows, not facing to street, u factor 0.32 min. or better.Details
#10- remodel existing kitchen & bathroom including update electrical to bldg. code for kitchen & bathroom, replace 3 windows, not facing to street, u factor 0.32 min. or better. | $10,000 |
| Dec 31, 2014 | Completed final sign-off Mar 2015 | 441 24th Av | unit #5:remodel extg kitchen and bathroom including update the electrical and plumbing to the bldg code for the kitchen and bathroom. replace 3 windows not visible from the street. u-factor 0.32 max.Details
unit #5:remodel extg kitchen and bathroom including update the electrical and plumbing to the bldg code for the kitchen and bathroom. replace 3 windows not visible from the street. u-factor 0.32 max. | $18,000 |
| Dec 17, 2014 | Completed final sign-off Oct 2015 | 55 Park St | #201: remodel existing kitchen & update electric to bldg code for kitchen. lighting - minimum 50% of total wattage shall be high efficacy.Details
#201: remodel existing kitchen & update electric to bldg code for kitchen. lighting - minimum 50% of total wattage shall be high efficacy. | $5,000 |
| Dec 8, 2014 | Completed final sign-off Apr 2015 | 2151 16th Av | remodel existing kitchen, add one (n) bath, study room on 2/f. construct one (n) family room, one bedroom, one storage and 2 bathrooms on g/f. replace existing water heater and furnace on g/f.Details
remodel existing kitchen, add one (n) bath, study room on 2/f. construct one (n) family room, one bedroom, one storage and 2 bathrooms on g/f. replace existing water heater and furnace on g/f. | $60,000 |
| Nov 21, 2014 | Completed final sign-off Jun 2015 | 1520 Geneva Av | remodel existing kitchen and update electric to building code for kitchen. no wall modification/no structural workDetails
remodel existing kitchen and update electric to building code for kitchen. no wall modification/no structural work | $8,000 |
| Oct 1, 2014 | Completed final sign-off Nov 2014 | 1520 Geneva Av | remodel existing kitchen and update elec to building coee for kitchen. no walls removedDetails
remodel existing kitchen and update elec to building coee for kitchen. no walls removed | $10,000 |
| Sep 17, 2014 | Completed final sign-off Nov 2014 | 441 24th Av | remodel (e) kitchen and bathroom including upgrade the electrical and plumbing to the bldg. code for kitchen and bathroomDetails
remodel (e) kitchen and bathroom including upgrade the electrical and plumbing to the bldg. code for kitchen and bathroom | $8,000 |
| Aug 12, 2014 | Completed final sign-off Jun 2015 | 1359 Sacramento St | unit b4- remodel kitchen & bath, replace 3 windows, u factor .4; unit c2- remodel bathromm; to comply with cec 150.0(k) 3 & 5Details
unit b4- remodel kitchen & bath, replace 3 windows, u factor .4; unit c2- remodel bathromm; to comply with cec 150.0(k) 3 & 5 | $15,000 |
| Jun 12, 2014 | Expired or cancelled cancelled Jan 2016 | 751 Madrid St | remove 2 illegal units at 1/f, kitchens & bathrooms. to remove illegal units in response to complaint #200341119 & #201261382.Details
remove 2 illegal units at 1/f, kitchens & bathrooms. to remove illegal units in response to complaint #200341119 & #201261382. | $2,000 |
| Jan 23, 2014 | Completed final sign-off May 2015 | 1801 Anza St | remodel (e) kitchen, remodel (e) master bathroom, remodel (e) guest bathroom, all new lights will be high efficiency, same location, no wall to be moved. replace all bathroom exhaust fans with new & humidistats.Details
remodel (e) kitchen, remodel (e) master bathroom, remodel (e) guest bathroom, all new lights will be high efficiency, same location, no wall to be moved. replace all bathroom exhaust fans with new & humidistats. | $18,000 |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 4348 21st St | ground floor. add 1 storage, 1 bath. 2nd fl remodel kitchen and bath. convert e study into master bath and closetDetails
ground floor. add 1 storage, 1 bath. 2nd fl remodel kitchen and bath. convert e study into master bath and closet | $32,000 |
| Sep 12, 2013 | Completed final sign-off Oct 2013 | 41 Lydia Av | remodel existing kitchen.Details
remodel existing kitchen. | $10,000 |
| May 14, 2013 | Completed final sign-off Dec 2013 | 1291 Fulton St | repair of fire damage at (e) restaurant at ground floor per plan including kitchen, restroom, dining area, storefront & roofing (in compliance of nov#201282111 to repair gas lines and repair water heater)Details
repair of fire damage at (e) restaurant at ground floor per plan including kitchen, restroom, dining area, storefront & roofing (in compliance of nov#201282111 to repair gas lines and repair water heater) | $60,000 |
| May 8, 2013 | Completed final sign-off Jul 2013 | 110 Clinton Pk | remodel existing kitchen, replace cabinets and counter top, no new lighting under this permitDetails
remodel existing kitchen, replace cabinets and counter top, no new lighting under this permit | $7,000 |
| Oct 19, 2012 | Completed final sign-off Feb 2013 | 1554 Shafter Av | comply with nov 200928661 to legalize e bath, storage room, laundry rarea, 2 bedroom s at gr floor. remove 3 counters and sink per plan. legalize e deck at 2nd fl, remodel kitchen and bath at 2nd flDetails
comply with nov 200928661 to legalize e bath, storage room, laundry rarea, 2 bedroom s at gr floor. remove 3 counters and sink per plan. legalize e deck at 2nd fl, remodel kitchen and bath at 2nd fl | $22,000 |
| Jul 3, 2012 | Never finaled issued Jul 2012, no final | 226 Valencia St | remodel (e) kitchen & change (e) closet to (n) bathroom @ 2nd. floor per plan.Details
remodel (e) kitchen & change (e) closet to (n) bathroom @ 2nd. floor per plan. | $18,000 |
| Mar 29, 2012 | Completed final sign-off Apr 2012 | 1520 Geneva Av | unit #2: replace tile floor, cabinets, coutner tops for kitchen same location of plumbing and stove, no new rough plumbing to comply with complaint 201201901Details
unit #2: replace tile floor, cabinets, coutner tops for kitchen same location of plumbing and stove, no new rough plumbing to comply with complaint 201201901 | $9,000 |
| Sep 8, 2011 | Completed final sign-off Feb 2012 | 1322 40th Av | remodel kitchen & 1-bathroom. change cabinets, countertop, floor tile, no change to wall & ceiling. bathroom; change vanity, countertop, floor & tub. no change to wall & ceiling.Details
remodel kitchen & 1-bathroom. change cabinets, countertop, floor tile, no change to wall & ceiling. bathroom; change vanity, countertop, floor & tub. no change to wall & ceiling. | $8,000 |
| Jul 13, 2010 | Never finaled issued Jul 2010, no final | 200 Kenwood Wy | install (2) french doors (exterior in rear of house) - 1 -door per room. replace faucet in kitchen, upgrate electrical in rear rooms. door to remain locked and obstructed to preven opening. ***amend permit application # 201007126402 with the mentioned work.Details
install (2) french doors (exterior in rear of house) - 1 -door per room. replace faucet in kitchen, upgrate electrical in rear rooms. door to remain locked and obstructed to preven opening. ***amend permit application # 201007126402 with the mentioned work. | $1,000 |