Block 6688, lot 030
55 Park St
- City’s use
- Multi-Family Residential
- Built
- 1963
- Stories
- 2
- Units
- 10
- Rooms
- 10 bathrooms
- Building
- 7,076 sq ft
- Lot
- 4,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 17, 2025 | Completed final sign-off Apr 2026 | 55 Park St | replace 22 windows like for like. street facing. uf<=0.3Details
replace 22 windows like for like. street facing. uf<=0.3 | $35,000 | |
| Jan 16, 2020 | Never finaled filed Jan 2020, never issued | 55 Park St | add two units on the 1st floor per ordinance 162-16. unit #1: replace the (e) garage door with wood trim & aluminum clad window. eliminated (e) curb cut in front of unit 1.one office,one 3 fixture bath, kitchen & living area & sleeping area. unit #2: one bed,one 3 fixture bath, kitchen & living roomDetails
add two units on the 1st floor per ordinance 162-16. unit #1: replace the (e) garage door with wood trim & aluminum clad window. eliminated (e) curb cut in front of unit 1.one office,one 3 fixture bath, kitchen & living area & sleeping area. unit #2: one bed,one 3 fixture bath, kitchen & living room | $50,000 | |
| Sep 2, 2016 | Completed final sign-off Mar 2017 | 55 Park St | Jones Bros Construction & Design Inc | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. install shear walls and moment frames.Details
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. install shear walls and moment frames. | $50,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2016 | 55 Park St | Jones Bros Construction Inc | unit #205: remodel existing kitchen and bathroom. updgrade electrical to kitchen and bathroom to code.Details
unit #205: remodel existing kitchen and bathroom. updgrade electrical to kitchen and bathroom to code. | $15,000 |
| Sep 23, 2015 | Completed final sign-off Oct 2015 | 55 Park St | Jones Bros Construction Inc | #103 - remodel bathroom ; update electrical to building code. all (n) lites shall be high efficacy (led flourescent) (e) exh. fan to remain.Details
#103 - remodel bathroom ; update electrical to building code. all (n) lites shall be high efficacy (led flourescent) (e) exh. fan to remain. | $7,000 |
| Dec 17, 2014 | Completed final sign-off Oct 2015 | 55 Park St | Jones Bros Construction Inc | #201: remodel existing kitchen & update electric to bldg code for kitchen. lighting - minimum 50% of total wattage shall be high efficacy.Details
#201: remodel existing kitchen & update electric to bldg code for kitchen. lighting - minimum 50% of total wattage shall be high efficacy. | $5,000 |
| Nov 21, 2014 | Completed final sign-off Dec 2014 | 55 Park St | Jones Bros Construction Inc | remodel existing bathroom. no wall modification/no structural workDetails
remodel existing bathroom. no wall modification/no structural work | $5,000 |
| Aug 11, 2009 | Completed final sign-off Aug 2009 | 55 Park St | Yellowzone Roofing | re-roofing, remove (e) roofing material replace with modified bitumenDetails
re-roofing, remove (e) roofing material replace with modified bitumen | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jones Bros Construction Inc (4), Jones Bros Construction & Design Inc, Yellowzone Roofing
- Engineers
- Jeff Chow
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.