Back to bathroom remodel contractors
Johnstone - Mc Auliffe Const. Inc.
- Based in
- Pacifica
- On San Francisco permits
- May 2000 to May 2026
- Last 24 months
- 4 permits filed
158 permits since 2000: 106 completed, 3 in progress, 35 never finaled, 14 expired or cancelled.
Of the 35 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 30 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 17 completed, 2 in progress, 3 never finaled, 2 expired or cancelled. Typically 8 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | In progress filed Feb 2026, not yet issued | 1329 45th Av | this application involves a vertical 1- story addition to an existing 2- story dwelling. addition comprises sleeping and bath rooms, a new stair, and storage. remodeled areas involves a new dining area, and powder roomDetails
this application involves a vertical 1- story addition to an existing 2- story dwelling. addition comprises sleeping and bath rooms, a new stair, and storage. remodeled areas involves a new dining area, and powder room | $210,000 |
| Dec 8, 2025 | In progress issued Sep 2026 | 88 28th St | non-structural interior alterations. renovation of kitchen and two bathrooms. addition of kitchette at first floor. upgrade to (e) water meter replacement of gas to heater and furnance w/electric. (under separate permit).Details
non-structural interior alterations. renovation of kitchen and two bathrooms. addition of kitchette at first floor. upgrade to (e) water meter replacement of gas to heater and furnance w/electric. (under separate permit). | $125,000 |
| Nov 1, 2021 | Completed final sign-off May 2022 | 970 Tennessee St | soft demo interior (e) tenant warehouse space in a umu urban mixed use district. no demo of (e) bathrooms, exteriors, or structural connponents.ab-017Details
soft demo interior (e) tenant warehouse space in a umu urban mixed use district. no demo of (e) bathrooms, exteriors, or structural connponents.ab-017 | $5,000 |
| Apr 24, 2019 | Completed final sign-off Jun 2019 | 184 Hooper St | 1st flr bathrooms - new plumbing fixtures, new paritionsDetails
1st flr bathrooms - new plumbing fixtures, new paritions | $200,000 |
| Jan 30, 2018 | Completed final sign-off Feb 2019 | 1225 Minnesota St | voluntary strengthening on an existing factory warehouse including strengthening, addition of a 2 hr fire rated property wall, accesible bathrooms, accesible path into and throughout the main level and accesible means of egress. maher n/aDetails
voluntary strengthening on an existing factory warehouse including strengthening, addition of a 2 hr fire rated property wall, accesible bathrooms, accesible path into and throughout the main level and accesible means of egress. maher n/a | $650,000 |
| Jul 19, 2016 | Completed final sign-off Jan 2017 | 115 Mountain Spring Av | interior remodel of one (e) kitchen, 3 (e) bathrooms, and replace existing floor & wall finishes throughout house.Details
interior remodel of one (e) kitchen, 3 (e) bathrooms, and replace existing floor & wall finishes throughout house. | $80,000 |
| Nov 9, 2015 | Completed final sign-off Mar 2017 | 38 Bryant St | interior renovation to an existing 2 story residential condominium unit within an existing bldg. renovate kitchen & bath, finishes & replace (e) stair within unit in kind. n/a ordinance #155-13Details
interior renovation to an existing 2 story residential condominium unit within an existing bldg. renovate kitchen & bath, finishes & replace (e) stair within unit in kind. n/a ordinance #155-13 | $167,000 |
| Feb 19, 2014 | Completed final sign-off Apr 2015 | 1750 Taylor St | interior remodel of extg condo unit with reconfiguration of kitchen, living room, dining room, 2 baths, closet and study. replace sliding doors at extg location in low e and glazed unit. no structural workDetails
interior remodel of extg condo unit with reconfiguration of kitchen, living room, dining room, 2 baths, closet and study. replace sliding doors at extg location in low e and glazed unit. no structural work | $185,000 |
| Jan 28, 2014 | Completed final sign-off Sep 2014 | 1306 Mcallister St | interior remodel of the kichen, laundry & bathroom on the 1st fl. reconfifure kitchen, add (1) new shower & (1) new sink. no exterior work, no added fl area or change of occupancy. electrical, plumbing, mechanical under separate permit.Details
interior remodel of the kichen, laundry & bathroom on the 1st fl. reconfifure kitchen, add (1) new shower & (1) new sink. no exterior work, no added fl area or change of occupancy. electrical, plumbing, mechanical under separate permit. | $25,000 |
| Dec 16, 2013 | Completed final sign-off Jul 2014 | 1337 45th Av | non bearing demo and eplacement of bathroom. includes finishes, fixtures. no additonal units or floor area. no change in occupancy.Details
non bearing demo and eplacement of bathroom. includes finishes, fixtures. no additonal units or floor area. no change in occupancy. | $20,000 |
| Oct 18, 2013 | Completed final sign-off Jan 2014 | 1329 45th Av | non structural interior renovation including new kitchen, bathroom, finishes, electrical, plumbing. conversion of 322 sq ft interior area to new bedroom, bathroom & hallDetails
non structural interior renovation including new kitchen, bathroom, finishes, electrical, plumbing. conversion of 322 sq ft interior area to new bedroom, bathroom & hall | $50,000 |
| Jul 6, 2012 | Completed final sign-off Jun 2015 | 1070 Green St | full renovation of an (e) condo unit, enclose (e) balcony. replace (e) windows in kind. remodel (e) non structural partitions, ceiling finishes & floor finishes. provide new living area, kitchen, bedroom, home office & bathrooms.Details
full renovation of an (e) condo unit, enclose (e) balcony. replace (e) windows in kind. remodel (e) non structural partitions, ceiling finishes & floor finishes. provide new living area, kitchen, bedroom, home office & bathrooms. | $200,000 |
| May 31, 2012 | Never finaled issued Jul 2012, no final | 350 Kansas St | interior work only. demo of non load bearing interior partitions. addition of 2 new storage areas and non load bearing partitons. accessible baths and path of travel are existing,to remain. mep and life safety separate permit. kitchen to remainDetails
interior work only. demo of non load bearing interior partitions. addition of 2 new storage areas and non load bearing partitons. accessible baths and path of travel are existing,to remain. mep and life safety separate permit. kitchen to remain | $18,000 |
| May 31, 2012 | Completed final sign-off Feb 2013 | 360 Kansas St | interior work only. includes demo of non load bearing interior partitoin. addition of workshop, non load bearing partitions, accessible bathrooms and path of travel are existing, to remain. elec and life safety under separate permitDetails
interior work only. includes demo of non load bearing interior partitoin. addition of workshop, non load bearing partitions, accessible bathrooms and path of travel are existing, to remain. elec and life safety under separate permit | $32,000 |
| May 31, 2012 | Completed final sign-off Jan 2013 | 1111 08th St | interior work only. mech., elec and life safety under seperate permit. demo of 1 non bearing interior partitoin. addition of 3 new classroom spaces. accessible baths, elevator and path of trvel are existing to remainDetails
interior work only. mech., elec and life safety under seperate permit. demo of 1 non bearing interior partitoin. addition of 3 new classroom spaces. accessible baths, elevator and path of trvel are existing to remain | $15,000 |
| Apr 23, 2012 | Never finaled issued May 2012, no final | 836 Montgomery St | office tenant improvement of suite a. all work is interior. work to include demo of existing interior interior partitions, mezzaninie level. new interior paritiions, bathrooms, breakroom, ceiling and case work. mep, fire safety separate permitDetails
office tenant improvement of suite a. all work is interior. work to include demo of existing interior interior partitions, mezzaninie level. new interior paritiions, bathrooms, breakroom, ceiling and case work. mep, fire safety separate permit | $261,000 |
| Mar 28, 2012 | Never finaled issued Apr 2012, no final | 836 Montgomery St | demolition of existing office space partitons, and mezzanine level. new interior partitions, bathrooms, breakroom, ceilings and casework. mep and life safety under sep permit.Details
demolition of existing office space partitons, and mezzanine level. new interior partitions, bathrooms, breakroom, ceilings and casework. mep and life safety under sep permit. | $165,000 |
| Nov 23, 2011 | Expired or cancelled expired Mar 2013 | 1070 Lombard St | kitchen & bathroom remodel-cabinets, countertops, vanity, tub replaced. new post & header at wall removedDetails
kitchen & bathroom remodel-cabinets, countertops, vanity, tub replaced. new post & header at wall removed | $51,500 |
| Dec 7, 2010 | Completed final sign-off May 2011 | 2484 Bush St | convert 2 existing closets to new full bath w/stall shower, relocate 1 existing window @ lightwell.relcoate (e) washer/dryer. plumbing, mech, ekec work under separte permit.Details
convert 2 existing closets to new full bath w/stall shower, relocate 1 existing window @ lightwell.relcoate (e) washer/dryer. plumbing, mech, ekec work under separte permit. | $15,000 |
| Oct 27, 2010 | Completed final sign-off Apr 2011 | 1075 California St | upgrade 2 (e) guest room bathrooms to full accessibility, partitions, plumbing fixtures, lights & finishes. no structural work, fire alarm & fire sprinkler changes unde seperate applicationDetails
upgrade 2 (e) guest room bathrooms to full accessibility, partitions, plumbing fixtures, lights & finishes. no structural work, fire alarm & fire sprinkler changes unde seperate application | $50,000 |
| May 5, 2009 | Completed final sign-off Nov 2009 | 3963 22nd St | interior alterations: complete renovation of 1 bath, 1 new pocket door,at 2nd flr. installation of (n) laundry sink at ground floor. replace 1 window at rear.Details
interior alterations: complete renovation of 1 bath, 1 new pocket door,at 2nd flr. installation of (n) laundry sink at ground floor. replace 1 window at rear. | $20,000 |
| Sep 20, 2004 | Completed final sign-off Aug 2005 | 315 Chestnut St | demo work only on third floor bathroom. remove non load bearing partitions. and (e) plumbing fixtureDetails
demo work only on third floor bathroom. remove non load bearing partitions. and (e) plumbing fixture | $1,000 |
| Nov 2, 2001 | Completed final sign-off May 2002 | 320 Wawona St | revision of approved app#200004278488 delete skylight revised plan at bathroomDetails
revision of approved app#200004278488 delete skylight revised plan at bathroom | |
| Sep 25, 2001 | Expired or cancelled cancelled Mar 2002 | 225 Jules Av | interior renovate 2 basement rooms within (e) storage, no structural walls, 1/2 bath, ext.door/windoDetails
interior renovate 2 basement rooms within (e) storage, no structural walls, 1/2 bath, ext.door/windo | $17,500 |