Back to kitchen remodel contractors
Joel Mark
- Based in
- Fremont
- On San Francisco permits
- Mar 2019 to May 2024
- Last 24 months
- 0 permits filed
47 permits since 2000: 24 completed, 3 in progress, 15 never finaled, 5 expired or cancelled.
Of the 15 never-finaled permits, 5 are 3 to 5 years old, 10 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 10 completed, 3 in progress, 1 expired or cancelled. Typically 1 days from filing to permit and 291 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2024 | In progress issued May 2024 | 188 Minna St | 1 kitchen and 2 full bathroom remodel, all rough-ins to remain in the same location new painting throughout new flooring througout. no removal of wallsDetails
1 kitchen and 2 full bathroom remodel, all rough-ins to remain in the same location new painting throughout new flooring througout. no removal of walls | $40,000 |
| Sep 11, 2023 | In progress issued Sep 2024 | 2755 Scott St | revision to pa# 201801098205-s2: new unconditioned closet @ 1st floor, renovate & expand kitchen @ 2nd floor. work is extracted from previously approved pa# 201801098205 with sturctural revisions.Details
revision to pa# 201801098205-s2: new unconditioned closet @ 1st floor, renovate & expand kitchen @ 2nd floor. work is extracted from previously approved pa# 201801098205 with sturctural revisions. | $152,000 |
| Jul 3, 2023 | Completed final sign-off Feb 2026 | 72 Jordan Av | remodel 1/f bathroom & kitchen. all new finishes, plumbing and electrical. remodel 2/f bathroom master, all new finishes, plumbing and electrical. title 24 compliant. remodel in kind.Details
remodel 1/f bathroom & kitchen. all new finishes, plumbing and electrical. remodel 2/f bathroom master, all new finishes, plumbing and electrical. title 24 compliant. remodel in kind. | $150,000 |
| Apr 21, 2023 | In progress issued Nov 2023 | 1778 48th Av | fl1: convert portion of (e) fl into new primary bath, bedrm, closet & laundry rm, remove (e) back drs & windows & replace w/ new fire-rated drywall on (e) garage walls ceilings. fl2: remove portion of walls between kitchen and living rm. new laundryDetails
fl1: convert portion of (e) fl into new primary bath, bedrm, closet & laundry rm, remove (e) back drs & windows & replace w/ new fire-rated drywall on (e) garage walls ceilings. fl2: remove portion of walls between kitchen and living rm. new laundry | $75,000 |
| Jun 24, 2022 | Completed final sign-off Jul 2022 | 1261 Filbert St | revision to pa# 202206075774 & 202001091530. consisting of infilling (e) door at rear kitchen & removing (e) exterior stair, see main floor plan.Details
revision to pa# 202206075774 & 202001091530. consisting of infilling (e) door at rear kitchen & removing (e) exterior stair, see main floor plan. | |
| Feb 28, 2022 | Expired or cancelled withdrawn Jul 2022 | 1261 Filbert St | revision to pa #202001091530: add a deck and stairs leading to the kitchen. changing main floor full bath to a powder room. changing dining area into a bedroom. adding stairs from the back ot go in the basement floor and a new door. adding access to attic.Details
revision to pa #202001091530: add a deck and stairs leading to the kitchen. changing main floor full bath to a powder room. changing dining area into a bedroom. adding stairs from the back ot go in the basement floor and a new door. adding access to attic. | $60,000 |
| Nov 23, 2021 | Completed final sign-off Jun 2022 | 254 32nd Av | one kitchen remodel. no structural walls being moved. plumbing remain.Details
one kitchen remodel. no structural walls being moved. plumbing remain. | $50,000 |
| Jan 29, 2021 | Completed final sign-off Nov 2021 | 1783 Turk St | bathroom remodel - all rough to remain the same. kitchen remodel all nw finishes all rough to remain the same. replace patio door in kind. rear of bldg update to tile 24 compliant. no moving walls.Details
bathroom remodel - all rough to remain the same. kitchen remodel all nw finishes all rough to remain the same. replace patio door in kind. rear of bldg update to tile 24 compliant. no moving walls. | $80,000 |
| Oct 28, 2020 | Completed final sign-off Oct 2021 | 1781 Turk St | remodel 1 kitchen and 1 bathroom in-kind. update electrical to t-24 compliant. plumbing to remain. no exterior workDetails
remodel 1 kitchen and 1 bathroom in-kind. update electrical to t-24 compliant. plumbing to remain. no exterior work | $60,000 |
| Aug 14, 2020 | Completed final sign-off Jul 2021 | 2111 Baker St | replace two french doors. replace two windows not visible from street. complete kitchen remodel. new bathroom. remodel one bathroomDetails
replace two french doors. replace two windows not visible from street. complete kitchen remodel. new bathroom. remodel one bathroom | $200,000 |
| Aug 5, 2020 | Completed final sign-off Apr 2021 | 3430 Baker St | replacing kitchen backdoor in kindDetails
replacing kitchen backdoor in kind | $250 |
| Dec 12, 2019 | Completed final sign-off Apr 2023 | 1259 Filbert St | interior remodel on 2nd fl. combine living and bedroom into master suite. remodel kitchen. add 1 1/2 bath and stair connect new habitable space on 1st fl. new lighting throughout.convert 1st fl rear portion of garage into playroom, 1 bedroom, 1 bath, laundryDetails
interior remodel on 2nd fl. combine living and bedroom into master suite. remodel kitchen. add 1 1/2 bath and stair connect new habitable space on 1st fl. new lighting throughout.convert 1st fl rear portion of garage into playroom, 1 bedroom, 1 bath, laundry | $20,000 |
| Jun 25, 2019 | Completed final sign-off Aug 2019 | 1760 Dolores St | remodel bathroom. replace tub, vanity, tile. existing plumbing to remain. install new shower valve, new can lights, kitchen reface. new doors and new countertops. all existing electrical and plumbing to remain the same. bathroom: 5' x 8'. kitchen: 8' x 8'.Details
remodel bathroom. replace tub, vanity, tile. existing plumbing to remain. install new shower valve, new can lights, kitchen reface. new doors and new countertops. all existing electrical and plumbing to remain the same. bathroom: 5' x 8'. kitchen: 8' x 8'. | $30,000 |
| Mar 22, 2019 | Completed final sign-off Jul 2020 | 99 22nd Av | electrical upgrade; 1st fl - kitchen remodel & powder room, remove glassblock opening; 2nd fl - remodel (e) master bath, bath 2, add new bath & master closetDetails
electrical upgrade; 1st fl - kitchen remodel & powder room, remove glassblock opening; 2nd fl - remodel (e) master bath, bath 2, add new bath & master closet | $300,000 |