Back to bathroom remodel contractors
Joel Mark
- Based in
- Fremont
- On San Francisco permits
- Mar 2019 to May 2024
- Last 24 months
- 0 permits filed
47 permits since 2000: 24 completed, 3 in progress, 15 never finaled, 5 expired or cancelled.
Of the 15 never-finaled permits, 5 are 3 to 5 years old, 10 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 11 completed, 2 in progress, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 361 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2024 | In progress issued May 2024 | 188 Minna St | 1 kitchen and 2 full bathroom remodel, all rough-ins to remain in the same location new painting throughout new flooring througout. no removal of wallsDetails
1 kitchen and 2 full bathroom remodel, all rough-ins to remain in the same location new painting throughout new flooring througout. no removal of walls | $40,000 |
| Jul 3, 2023 | Completed final sign-off Feb 2026 | 72 Jordan Av | remodel 1/f bathroom & kitchen. all new finishes, plumbing and electrical. remodel 2/f bathroom master, all new finishes, plumbing and electrical. title 24 compliant. remodel in kind.Details
remodel 1/f bathroom & kitchen. all new finishes, plumbing and electrical. remodel 2/f bathroom master, all new finishes, plumbing and electrical. title 24 compliant. remodel in kind. | $150,000 |
| Apr 21, 2023 | In progress issued Nov 2023 | 1778 48th Av | fl1: convert portion of (e) fl into new primary bath, bedrm, closet & laundry rm, remove (e) back drs & windows & replace w/ new fire-rated drywall on (e) garage walls ceilings. fl2: remove portion of walls between kitchen and living rm. new laundryDetails
fl1: convert portion of (e) fl into new primary bath, bedrm, closet & laundry rm, remove (e) back drs & windows & replace w/ new fire-rated drywall on (e) garage walls ceilings. fl2: remove portion of walls between kitchen and living rm. new laundry | $75,000 |
| Nov 7, 2022 | Completed final sign-off Apr 2024 | 3365 Clay St | one master bath shower remodel. all structural to remain, all rough to remain.Details
one master bath shower remodel. all structural to remain, all rough to remain. | $15,000 |
| Feb 28, 2022 | Expired or cancelled withdrawn Jul 2022 | 1261 Filbert St | revision to pa #202001091530: add a deck and stairs leading to the kitchen. changing main floor full bath to a powder room. changing dining area into a bedroom. adding stairs from the back ot go in the basement floor and a new door. adding access to attic.Details
revision to pa #202001091530: add a deck and stairs leading to the kitchen. changing main floor full bath to a powder room. changing dining area into a bedroom. adding stairs from the back ot go in the basement floor and a new door. adding access to attic. | $60,000 |
| Jan 21, 2022 | Completed final sign-off Jun 2022 | 254 32nd Av | main floor: convert existing storage area into a powder bathroom.Details
main floor: convert existing storage area into a powder bathroom. | $10,000 |
| Jan 20, 2022 | Completed final sign-off Sep 2022 | 1036 Francisco St | 1 bathroom remodel. plumbing location to remain. structural to remain. new electrical in bathroom. replacing can lights with new led lights can lighting throughout home. t-24 complaint. no wall alteration.Details
1 bathroom remodel. plumbing location to remain. structural to remain. new electrical in bathroom. replacing can lights with new led lights can lighting throughout home. t-24 complaint. no wall alteration. | $150,000 |
| Jun 15, 2021 | Never finaled issued Jun 2021, no final | 2310 Buchanan St | amendment to current permit 2020-1218-1331 - change of turning existing bathroom to 2 bathroom. bath 2Details
amendment to current permit 2020-1218-1331 - change of turning existing bathroom to 2 bathroom. bath 2 | $30,000 |
| May 28, 2021 | Expired or cancelled expired Mar 2026 | 2842 Filbert St | basement fl-replace perimeter concrete foundation at rear. add (n) workout rm, (n) bath. 1st flr-enlarge (e) fam rm, add (n) deck & stairs to rear yard. 2nd flr-add (n) deck off (e) dining rm. 3rd flr-replace (e) glass guardrail & (e) sliding glass door systemDetails
basement fl-replace perimeter concrete foundation at rear. add (n) workout rm, (n) bath. 1st flr-enlarge (e) fam rm, add (n) deck & stairs to rear yard. 2nd flr-add (n) deck off (e) dining rm. 3rd flr-replace (e) glass guardrail & (e) sliding glass door system | $325,000 |
| Jan 29, 2021 | Completed final sign-off Nov 2021 | 1783 Turk St | bathroom remodel - all rough to remain the same. kitchen remodel all nw finishes all rough to remain the same. replace patio door in kind. rear of bldg update to tile 24 compliant. no moving walls.Details
bathroom remodel - all rough to remain the same. kitchen remodel all nw finishes all rough to remain the same. replace patio door in kind. rear of bldg update to tile 24 compliant. no moving walls. | $80,000 |
| Dec 18, 2020 | Never finaled issued Dec 2020, no final | 2310 Buchanan St | replacing bathroom finishes, new shower, new tube, new vanity, all rough plumbing/electrical to remain the same, no change to (e) framingDetails
replacing bathroom finishes, new shower, new tube, new vanity, all rough plumbing/electrical to remain the same, no change to (e) framing | $40,000 |
| Oct 28, 2020 | Completed final sign-off Oct 2021 | 1781 Turk St | remodel 1 kitchen and 1 bathroom in-kind. update electrical to t-24 compliant. plumbing to remain. no exterior workDetails
remodel 1 kitchen and 1 bathroom in-kind. update electrical to t-24 compliant. plumbing to remain. no exterior work | $60,000 |
| Aug 14, 2020 | Completed final sign-off Jul 2021 | 2111 Baker St | replace two french doors. replace two windows not visible from street. complete kitchen remodel. new bathroom. remodel one bathroomDetails
replace two french doors. replace two windows not visible from street. complete kitchen remodel. new bathroom. remodel one bathroom | $200,000 |
| Aug 7, 2020 | Expired or cancelled cancelled Sep 2024 | 2111 Baker St | demo of (1) bathroom, demo of cabinetry throughout. fixtures only no remodel of lath or sheetrackDetails
demo of (1) bathroom, demo of cabinetry throughout. fixtures only no remodel of lath or sheetrack | $6,000 |
| Jun 16, 2020 | Never finaled issued Jun 2020, no final | 2711 Scott St | front deck terrace leak repair at third floor in-kind with new waterproofing. 2nd flr bath - new tub shower, new vanity, new finishes.Details
front deck terrace leak repair at third floor in-kind with new waterproofing. 2nd flr bath - new tub shower, new vanity, new finishes. | $60,000 |
| Jan 28, 2020 | Completed final sign-off Apr 2023 | 1259 Filbert St | revision to pa# 2019-1212-9315: re-arrange bathroom & windows at 1st floor. replace foundation at garage. all details no change. shall follow previous approved plans.Details
revision to pa# 2019-1212-9315: re-arrange bathroom & windows at 1st floor. replace foundation at garage. all details no change. shall follow previous approved plans. | $20,000 |
| Dec 12, 2019 | Completed final sign-off Apr 2023 | 1259 Filbert St | interior remodel on 2nd fl. combine living and bedroom into master suite. remodel kitchen. add 1 1/2 bath and stair connect new habitable space on 1st fl. new lighting throughout.convert 1st fl rear portion of garage into playroom, 1 bedroom, 1 bath, laundryDetails
interior remodel on 2nd fl. combine living and bedroom into master suite. remodel kitchen. add 1 1/2 bath and stair connect new habitable space on 1st fl. new lighting throughout.convert 1st fl rear portion of garage into playroom, 1 bedroom, 1 bath, laundry | $20,000 |
| Jun 25, 2019 | Completed final sign-off Aug 2019 | 1760 Dolores St | remodel bathroom. replace tub, vanity, tile. existing plumbing to remain. install new shower valve, new can lights, kitchen reface. new doors and new countertops. all existing electrical and plumbing to remain the same. bathroom: 5' x 8'. kitchen: 8' x 8'.Details
remodel bathroom. replace tub, vanity, tile. existing plumbing to remain. install new shower valve, new can lights, kitchen reface. new doors and new countertops. all existing electrical and plumbing to remain the same. bathroom: 5' x 8'. kitchen: 8' x 8'. | $30,000 |
| Mar 22, 2019 | Completed final sign-off Jul 2020 | 99 22nd Av | electrical upgrade; 1st fl - kitchen remodel & powder room, remove glassblock opening; 2nd fl - remodel (e) master bath, bath 2, add new bath & master closetDetails
electrical upgrade; 1st fl - kitchen remodel & powder room, remove glassblock opening; 2nd fl - remodel (e) master bath, bath 2, add new bath & master closet | $300,000 |