Joe's Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Feb 2023 to Oct 2026
- Last 24 months
- 6 permits filed
13 permits since 2000: 10 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Deck permits
3 deck permits: 1 completed, 2 in progress. Typically 153 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2026 | In progress issued Oct 2026 | 1619 33rd Av | 2nd floor: remodel kitchen and bath, and add powder room. new deck.Details
2nd floor: remodel kitchen and bath, and add powder room. new deck. | $80,000 |
| Dec 30, 2025 | In progress issued Jun 2026 | 271 Monticello St | demolish an attached wooden deck with staircase and construct a 2 story wooden deck at back of house. special inspection on strong tie bracket installation and deck framing. change window to slider at 2nd flDetails
demolish an attached wooden deck with staircase and construct a 2 story wooden deck at back of house. special inspection on strong tie bracket installation and deck framing. change window to slider at 2nd fl | $28,000 |
| Feb 6, 2023 | Completed final sign-off Feb 2025 | 2247 31st Av | revision to approved permit# 202205164324. at 2nd floor, reconfigure deck layout; new half bath; 2nd-story addition (45 sf) at lightwell as an expansion to new bedroom at 1st floor, change 1st floor layout; excavate yard with steps and retaining wall; reconfigure bathrooms layout; relocated wet bar.Details
revision to approved permit# 202205164324. at 2nd floor, reconfigure deck layout; new half bath; 2nd-story addition (45 sf) at lightwell as an expansion to new bedroom at 1st floor, change 1st floor layout; excavate yard with steps and retaining wall; reconfigure bathrooms layout; relocated wet bar. | $35,000 |