Joe's Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Feb 2023 to Dec 2025
- Last 24 months
- 6 permits filed
12 permits since 2000: 10 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2025 | In progress issued Jun 2026 | 271 Monticello St | demolish an attached wooden deck with staircase and construct a 2 story wooden deck at back of house. special inspection on strong tie bracket installation and deck framing. change window to slider at 2nd flDetails
demolish an attached wooden deck with staircase and construct a 2 story wooden deck at back of house. special inspection on strong tie bracket installation and deck framing. change window to slider at 2nd fl | $28,000 |
| Jan 27, 2025 | Completed final sign-off Feb 2025 | 2247 31st Av | revision to permit 202205164324. relocate exterior rear stair per plan. add partition walls at new media room. ref permit 202302061476.Details
revision to permit 202205164324. relocate exterior rear stair per plan. add partition walls at new media room. ref permit 202302061476. | $800 |
| Jan 17, 2025 | Completed final sign-off Feb 2025 | 535 Moscow St | replace one sliding door at the back and 3 windows. replace two fiberglass windows at the front and one window at the kitchen area.Details
replace one sliding door at the back and 3 windows. replace two fiberglass windows at the front and one window at the kitchen area. | $1,500 |
| Dec 16, 2024 | Completed final sign-off Feb 2025 | 466 25th Av | remove and replace (e) wood shingles at front and in-kindDetails
remove and replace (e) wood shingles at front and in-kind | $6,700 |
| Dec 16, 2024 | Completed final sign-off Feb 2025 | 535 Moscow St | replace the existing siding boards in the frontDetails
replace the existing siding boards in the front | $6,200 |
| Nov 14, 2024 | Completed final sign-off Jan 2025 | 535 Moscow St | replace the existing siding board at the backDetails
replace the existing siding board at the back | $6,500 |
| Sep 5, 2024 | Expired or cancelled cancelled Nov 2024 | 233 15th Av | rev to 202408198965: remove the (e) stucco wall and install the siding board.Details
rev to 202408198965: remove the (e) stucco wall and install the siding board. | |
| Aug 19, 2024 | Completed final sign-off Dec 2024 | 233 15th Av | replace front stucco wall.Details
replace front stucco wall. | $22,000 |
| Jun 6, 2024 | Completed final sign-off Sep 2025 | 2146 47th Av | to remodel one kitchen and two (e) bathrooms on the second floor.Details
to remodel one kitchen and two (e) bathrooms on the second floor. | $40,000 |
| May 31, 2024 | Completed final sign-off Oct 2024 | 590 Arguello Bl | remodel the (e) kitchen and (e) bathroom.Details
remodel the (e) kitchen and (e) bathroom. | $62,000 |
| May 28, 2024 | Completed final sign-off Jun 2024 | 479 Potrero Av | unit a: to legalize as built 3-fixture full bathroom on the ground level dwelling unit. the as built bathroom is converted and partitioned from the original 15-7x5' bathroom. each renovated bathroom size is 7-6x 5-0'. the bathroom legalixation shall include new lighting, electrical outlets, switchesDetails
unit a: to legalize as built 3-fixture full bathroom on the ground level dwelling unit. the as built bathroom is converted and partitioned from the original 15-7x5' bathroom. each renovated bathroom size is 7-6x 5-0'. the bathroom legalixation shall include new lighting, electrical outlets, switches | $12,000 |
| Feb 6, 2023 | Completed final sign-off Feb 2025 | 2247 31st Av | revision to approved permit# 202205164324. at 2nd floor, reconfigure deck layout; new half bath; 2nd-story addition (45 sf) at lightwell as an expansion to new bedroom at 1st floor, change 1st floor layout; excavate yard with steps and retaining wall; reconfigure bathrooms layout; relocated wet bar.Details
revision to approved permit# 202205164324. at 2nd floor, reconfigure deck layout; new half bath; 2nd-story addition (45 sf) at lightwell as an expansion to new bedroom at 1st floor, change 1st floor layout; excavate yard with steps and retaining wall; reconfigure bathrooms layout; relocated wet bar. | $35,000 |