Back to bathroom remodel contractors
Joe's Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Feb 2023 to Dec 2025
- Last 24 months
- 6 permits filed
12 permits since 2000: 10 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 4 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2024 | Completed final sign-off Sep 2025 | 2146 47th Av | to remodel one kitchen and two (e) bathrooms on the second floor.Details
to remodel one kitchen and two (e) bathrooms on the second floor. | $40,000 |
| May 31, 2024 | Completed final sign-off Oct 2024 | 590 Arguello Bl | remodel the (e) kitchen and (e) bathroom.Details
remodel the (e) kitchen and (e) bathroom. | $62,000 |
| May 28, 2024 | Completed final sign-off Jun 2024 | 479 Potrero Av | unit a: to legalize as built 3-fixture full bathroom on the ground level dwelling unit. the as built bathroom is converted and partitioned from the original 15-7x5' bathroom. each renovated bathroom size is 7-6x 5-0'. the bathroom legalixation shall include new lighting, electrical outlets, switchesDetails
unit a: to legalize as built 3-fixture full bathroom on the ground level dwelling unit. the as built bathroom is converted and partitioned from the original 15-7x5' bathroom. each renovated bathroom size is 7-6x 5-0'. the bathroom legalixation shall include new lighting, electrical outlets, switches | $12,000 |
| Feb 6, 2023 | Completed final sign-off Feb 2025 | 2247 31st Av | revision to approved permit# 202205164324. at 2nd floor, reconfigure deck layout; new half bath; 2nd-story addition (45 sf) at lightwell as an expansion to new bedroom at 1st floor, change 1st floor layout; excavate yard with steps and retaining wall; reconfigure bathrooms layout; relocated wet bar.Details
revision to approved permit# 202205164324. at 2nd floor, reconfigure deck layout; new half bath; 2nd-story addition (45 sf) at lightwell as an expansion to new bedroom at 1st floor, change 1st floor layout; excavate yard with steps and retaining wall; reconfigure bathrooms layout; relocated wet bar. | $35,000 |